CloudHQ MDC Campus

Manassas, Virginia, United StatesUnder construction
Evidence
Planned critical IT
300 MW
Updated
Oct 29, 2026

CloudHQ plans 300 MW of critical IT capacity at MDC, south of Routes 28/234. OCI describes three 84 MW structures totaling 252 MW without specifying the electrical basis; the scopes remain unreconciled, not operating load. OCI reports on-site quality work from early 2026 and names Holder Construction, Bureau Veritas and Engineering Consulting Services in project-delivery roles. Two on-site substations are planned, with private fiber ducts toward I-66 interconnections. CloudHQ advertises 1,000,000 square feet without defining gross-floor versus IT-space basis.

Capacity

Construction program capacity MW

Planned / design or future potential

252 MW

Source

Target critical IT capacity MW

Planned / design or future potential

300 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Milestones (1)
OCI began on-site construction quality work in early 2026.

2026 · Recorded actual event

Completed · Announced

Sources (1)

Participants

CloudHQ

Developer · Operator · Owner

Sources by role
Developer / Operator / Owner (1)
Developer / Operator / Owner (1)

Site & development

Site location

Reported rounded

South of Routes 28/234, operator coordinates 38.73088,-77.50829. Street/parcel boundary not independently recovered.

Source

Land and site control context

Reported rounded

CloudHQ identified as owner by project consultant; legal parcel title not checked.

Source

Reviewed mdc area context

Reported rounded

CloudHQ advertises 1,000,000 square feet for MDC without defining gross floor versus IT-white space basis. The figure is not verified completed or occupied area.

Source

Additional project facts

Reviewed mdc team context

Reported rounded

OCI identifies Holder Construction as general contractor, Bureau Veritas as owner representative, and Engineering Consulting Services as geotechnical engineer and special inspection/testing agency for MDC. OCI attributes its involvement to early 2026.

Source

Infrastructure & permits

Technical details (2)
Utility service

Reported context

Two on-site substations planned; utility connection allocation and energization not verified.

Fiber

Reported context

Private Manassas Fiber Highway ducts to I-66 long-haul interconnection points.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Digital Carver Brickyard Campus

Under construction · Manassas, Virginia, United States

Same locality: Manassas

Compare in a collection
Iron Mountain VA-1 Northern Virginia Data Center

Operating · Manassas, Virginia, United States

Same locality: Manassas

Compare in a collection
Iron Mountain VA-2 Northern Virginia Data Center

Operating · Manassas, Virginia, United States

Same locality: Manassas

Compare in a collection
QTS MAN1 Manassas Data Center Campus

Partially operational · Manassas, Virginia, United States

Same locality: Manassas

Compare in a collection