Hickory reports topping-out of MEL01C&D and installation of a link bridge connecting to the operating MEL01 facility. These are construction milestones, not confirmation that the entire 180 MW campus has been handed over or is operating. STACK MEL01 Melbourne Data Center Campus, also known as STACK MEL01, is a data center project in Melbourne, Victoria, AU developed and operated by STACK Infrastructure. Melbourne campus planned as two 36 MW buildings for 72 MW total critical capacity. High-density-ready campus design with robust regional power and network access. STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary. The financing record is scoped to the named development phase and is not treated as a facility valuation.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.
Milestones (2)
Aug 22, 2023 · Recorded actual event
Completed · Commercial operation
Source not linkedJul 23, 2025 · Recorded actual event
Completed · Financing
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STACK MEL01 campus brochure · Mar 16, 2023 · Primary
Other participants (1)
Utility provider
Sources by role
Utility provider (1)
- STACK MEL01 campus brochure · Mar 16, 2023 · Primary
Capital & incentives
Financing records
Debt financing
A$1,300,000,000Jul 23, 2025
Funds the next phase of MEL01 development; not a campus valuation or evidence that 180 MW is operating.
Parties & sources
STACK Infrastructure (Borrower)
Sources (1)
- STACK secures AUD 1.3 billion MEL01 green financing · Jul 23, 2025
Site & development
Additional project facts
Capacity basis
ActualSTACK Infrastructure publishes 72 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualSTACK now markets MEL01 as a four building 180 MW full build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.
SourceInfrastructure & permits
Technical details (3)
Energized
High-density-ready campus design with robust regional power and network access.
Energized
STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.
Energized
135 MW gross
Dedicated 66/11 kV onsite utility substation serving a phased 180 MW campus design.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (3)
Partially operational · Melbourne, Victoria, Australia
Same locality: Melbourne
Compare in a collectionPreconstruction · Melbourne, Victoria, Australia
Same locality: Melbourne
Compare in a collectionPreconstruction · Truganina, Victoria, Australia
Shared participant: STACK Infrastructure · Same market: Victoria, Australia
Compare in a collection