STACK MEL01 Melbourne Data Center Campus

Melbourne, Victoria, AustraliaPartially operational
Capacity
180 MW
Planned / design
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK MEL01 Melbourne Data Center Campus

STACK MEL01 Melbourne Data Center Campus, also known as STACK MEL01, is a data center project in Melbourne, Victoria, AU developed and operated by STACK Infrastructure. Melbourne campus planned as two 36 MW buildings for 72 MW total critical capacity. High-density-ready campus design with robust regional power and network access. STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary. The financing record is scoped to the named development phase and is not treated as a facility valuation.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load72 MWDesign · STACK MEL01 Melbourne Data Center Campus
Future Potential180 MWDesign · STACK MEL01 Melbourne Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.

Aug 22, 2023
First 36 MW MEL01 building completed
Completed
Jul 23, 2025
AUD 1.3 billion green financing closed for expansion
Completed

Infrastructure

Electric GridEnergized

High-density-ready campus design with robust regional power and network access.

FiberEnergized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric GridEnergized

135 MW gross

Dedicated 66/11 kV onsite utility substation serving a phased 180 MW campus design.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

9 facts
Location Context
STACK MEL01 | Melbourne | Victoria | AU
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
72 MW
Design
Capacity Basis
STACK Infrastructure publishes 72 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK MEL01 | Melbourne | Victoria | AU
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
STACK now markets MEL01 as a four building 180 MW full build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.
Actual
Building Count
4
Design