STACK MEL01 Melbourne Data Center Campus

Melbourne, Victoria, AustraliaPartially operational
Evidence
Planned critical IT
72 MW
Updated
Oct 28, 2026
Utility
Powercor

Hickory reports topping-out of MEL01C&D and installation of a link bridge connecting to the operating MEL01 facility. These are construction milestones, not confirmation that the entire 180 MW campus has been handed over or is operating. STACK MEL01 Melbourne Data Center Campus, also known as STACK MEL01, is a data center project in Melbourne, Victoria, AU developed and operated by STACK Infrastructure. Melbourne campus planned as two 36 MW buildings for 72 MW total critical capacity. High-density-ready campus design with robust regional power and network access. STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary. The financing record is scoped to the named development phase and is not treated as a facility valuation.

Capacity

Reported capacity

Design

72 MW

Source

Reported capacity

Planned / design or future potential

180 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.

Milestones (2)
First 36 MW MEL01 building completed

Aug 22, 2023 · Recorded actual event

Completed · Commercial operation

Source not linked
AUD 1.3 billion green financing closed for expansion

Jul 23, 2025 · Recorded actual event

Completed · Financing

Source not linked

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)
Other participants (1)
Powercor

Utility provider

Sources by role
Utility provider (1)

Capital & incentives

Financing records

Debt financing

A$1,300,000,000

Jul 23, 2025

Funds the next phase of MEL01 development; not a campus valuation or evidence that 180 MW is operating.

Parties & sources

STACK Infrastructure (Borrower)

Site & development

Location context

Actual

STACK MEL01 | Melbourne | Victoria | AU

Source

Location context

Actual

STACK MEL01 | Melbourne | Victoria | AU

Source

Building count

Design

4 buildings

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

STACK Infrastructure publishes 72 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

STACK now markets MEL01 as a four building 180 MW full build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

High-density-ready campus design with robust regional power and network access.

Fiber

Energized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric grid

Energized

135 MW gross

Dedicated 66/11 kV onsite utility substation serving a phased 180 MW campus design.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
AirTrunk MEL1 Melbourne Data Center Campus

Partially operational · Melbourne, Victoria, Australia

Same locality: Melbourne

Compare in a collection
AirTrunk MEL2 Melbourne Data Center Campus

Preconstruction · Melbourne, Victoria, Australia

Same locality: Melbourne

Compare in a collection
STACK MEL02 Truganina Data Center Campus

Preconstruction · Truganina, Victoria, Australia

Shared participant: STACK Infrastructure · Same market: Victoria, Australia

Compare in a collection