Cartis diligence evidence schedule
STACK MEL01 Melbourne Data Center Campus
PRJ-0902 · Site · Melbourne, Victoria, Australia
Record last updated Oct 28, 2026
Scope and capacity
Hickory reports topping-out of MEL01C&D and installation of a link bridge connecting to the operating MEL01 facility. These are construction milestones, not confirmation that the entire 180 MW campus has been handed over or is operating. STACK MEL01 Melbourne Data Center Campus, also known as STACK MEL01, is a data center project in Melbourne, Victoria, AU developed and operated by STACK Infrastructure. Melbourne campus planned as two 36 MW buildings for 72 MW total critical capacity. High-density-ready campus design with robust regional power and network access. STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary. The financing record is scoped to the named development phase and is not treated as a facility valuation.
Headline: 72 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (9)
Location context · STACK MEL01 | Melbourne | Victoria | AU
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 64180 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Lifecycle status · Partially operational
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 64181 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Reported capacity · 72 MW
Design · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 64182 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Capacity basis · STACK Infrastructure publishes 72 MW of critical IT capacity for this record boundary.
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 64183 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Location context · STACK MEL01 | Melbourne | Victoria | AU
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 93351 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Lifecycle status · Partially operational
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 93352 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Reported capacity · 180 MW
Planned / design or future potential · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 93353 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Capacity basis · STACK now markets MEL01 as a four building 180 MW full build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.
Actual · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 93354 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- STACK MEL01 campus brochure
STACK Infrastructure · Document date: Mar 16, 2023 · Primary
Source reference: SRC-3603 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf
Building count · 4 buildings
Design · STACK MEL01 Melbourne Data Center Campus (Project)
Claim 93358 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
- STACK Asia-Pacific current portfolio
STACK Infrastructure · Document date: Aug 29, 2026 · Primary
Source reference: SRC-5177 · Fact sheet · Recorded authority: Official primary
Source URL
https://www.stackinfra.com/locations/asia-pacific/
https://www.stackinfra.com/locations/asia-pacific/
Counterparties and capital
Powercor · Utility provider · CMP-1590
STACK Infrastructure · Developer · CMP-0102
A$1,300,000,000 · Jul 23, 2025
Funds the next phase of MEL01 development; not a campus valuation or evidence that 180 MW is operating.
STACK Infrastructure (Borrower)
Sources (1)
- STACK secures AUD 1.3 billion MEL01 green financing · Jul 23, 2025
Financing record 187; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.