Skip to content
← Return to profile

Cartis diligence evidence schedule

STACK MEL01 Melbourne Data Center Campus

PRJ-0902 · Site · Melbourne, Victoria, Australia

Captured 2026-09-06T04:12:16.249Z · Record last updated 2026-08-28

SHA-256: 9d5c6539b32251d35c7957cc6218554616d7f2f0a59bdf772ade945c53a8ab6a

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

STACK MEL01 Melbourne Data Center Campus, also known as STACK MEL01, is a data center project in Melbourne, Victoria, AU developed and operated by STACK Infrastructure. Melbourne campus planned as two 36 MW buildings for 72 MW total critical capacity. High-density-ready campus design with robust regional power and network access. STACK now markets MEL01 as a four-building 180 MW full-build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary. The financing record is scoped to the named development phase and is not treated as a facility valuation.

Headline: 180 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Location Context · STACK MEL01 | Melbourne | Victoria | AU

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 64180 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Lifecycle Status · Partially operational

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 64181 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Reported Capacity · 72 MW

design · STACK MEL01 Melbourne Data Center Campus (project)

Claim 64182 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Capacity Basis · STACK Infrastructure publishes 72 MW of critical IT capacity for this record boundary.

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 64183 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Location Context · STACK MEL01 | Melbourne | Victoria | AU

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 93351 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Lifecycle Status · Partially operational

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 93352 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Reported Capacity · 180 MW

Planned / design or future potential · STACK MEL01 Melbourne Data Center Campus (project)

Claim 93353 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Capacity Basis · STACK now markets MEL01 as a four building 180 MW full build campus. The first 36 MW building is operating, but the 180 MW headline is explicitly a wider phased design boundary.

actual · STACK MEL01 Melbourne Data Center Campus (project)

Claim 93354 · Review: Approved · Claim date: Not published

  1. STACK MEL01 campus brochure

    STACK Infrastructure · Document date: 2023-03-16 · Primary

    https://www.stackinfra.com/wp-content/uploads/2022/05/MEL01_Campus_Brochure_031623.pdf

Building Count · 4

design · STACK MEL01 Melbourne Data Center Campus (project)

Claim 93358 · Review: Approved · Claim date: Not published

  1. STACK Asia-Pacific current portfolio

    STACK Infrastructure · Document date: 2026-08-29 · Primary

    https://www.stackinfra.com/locations/asia-pacific/

Counterparties and capital

Powercor · Utility Provider · CMP-1590

STACK Infrastructure · Developer · CMP-0102

Debt Financing

A$1,300,000,000 · 2025-07-23

Funds the next phase of MEL01 development; not a campus valuation or evidence that 180 MW is operating.

STACK Infrastructure (Borrower)

Financing record 187; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.