STACK MEL02 Truganina Data Center Campus

Truganina, Victoria, AustraliaPreconstruction
Evidence
Planned critical IT
252 MW
Updated
Oct 28, 2026

Société Générale identifies an A$2.955 billion green loan supporting STACK’s MEL02 campus. This is a financing milestone, not evidence that the planned campus has opened. STACK MEL02 Truganina Data Center Campus, also known as STACK MEL02, is a data center project in Truganina, Victoria, AU developed and operated by STACK Infrastructure. 14-acre Melbourne-area campus planned as one building with 252 MW of critical capacity. Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling. 252 MW is the operator-published future facility or full-build design boundary.

Capacity

Reported capacity

Design

252 MW

Source

Reported capacity

Planned / design or future potential

252 MW

Source

Gross substation capacity

Design

300+ MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryAnnounced or preconstruction

252 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

STACK MEL02 | Truganina | Victoria | AU

Source

Location context

Actual

STACK MEL02 | Truganina | Victoria | AU

Source

Site area

Design

14 acres

Source

Building count

Design

1 building

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

STACK Infrastructure publishes 252 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

252 MW is the operator published future facility or full build design boundary.

Source

Substation voltage

Design

132 kV

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling.

Fiber

Planned or represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric grid

Planned or represented

300 MW gross

Dedicated 132 kV onsite substation rated for more than 300 MW gross; this utility rating is not IT capacity.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
STACK MEL01 Melbourne Data Center Campus

Partially operational · Melbourne, Victoria, Australia

Shared participant: STACK Infrastructure · Same market: Victoria, Australia

Compare in a collection