STACK MEL02 Truganina Data Center Campus

Truganina, Victoria, AustraliaPreconstruction
Capacity
252 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK MEL02 Truganina Data Center Campus

STACK MEL02 Truganina Data Center Campus, also known as STACK MEL02, is a data center project in Truganina, Victoria, AU developed and operated by STACK Infrastructure. 14-acre Melbourne-area campus planned as one building with 252 MW of critical capacity. Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling. 252 MW is the operator-published future facility or full-build design boundary.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load252 MWDesign · STACK MEL02 Truganina Data Center Campus
Future Potential252 MWDesign · STACK MEL02 Truganina Data Center Campus

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

252 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.

Aug 28, 2026
Current source record reviewed for STACK MEL02
Completed

Infrastructure

Electric GridPlanned Or Represented

Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling.

FiberPlanned Or Represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric GridPlanned Or Represented

300 MW gross

Dedicated 132 kV onsite substation rated for more than 300 MW gross; this utility rating is not IT capacity.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
STACK MEL02 | Truganina | Victoria | AU
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
252 MW
Design
Capacity Basis
STACK Infrastructure publishes 252 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK MEL02 | Truganina | Victoria | AU
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
252 MW
Design
Capacity Basis
252 MW is the operator published future facility or full build design boundary.
Actual
Site Area
14 acres
Design
Building Count
1 building
Design
Substation Voltage
132 kV
Design
Gross Substation Capacity
300+ MW
Design