STACK MEL02 Truganina Data Center Campus
- Planned critical IT
- 252 MW
- Updated
- Oct 28, 2026
Société Générale identifies an A$2.955 billion green loan supporting STACK’s MEL02 campus. This is a financing milestone, not evidence that the planned campus has opened. STACK MEL02 Truganina Data Center Campus, also known as STACK MEL02, is a data center project in Truganina, Victoria, AU developed and operated by STACK Infrastructure. 14-acre Melbourne-area campus planned as one building with 252 MW of critical capacity. Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling. 252 MW is the operator-published future facility or full-build design boundary.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
252 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.
Participants
Developer
Sources by role
Developer (1)
- STACK Infrastructure STACK MEL02 profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (3)
Planned or represented
Dedicated onsite 132 kV substation with more than 300 MW gross capacity and scalable high-density cooling.
Planned or represented
STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.
Planned or represented
300 MW gross
Dedicated 132 kV onsite substation rated for more than 300 MW gross; this utility rating is not IT capacity.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Partially operational · Melbourne, Victoria, Australia
Shared participant: STACK Infrastructure · Same market: Victoria, Australia
Compare in a collection