STACK DFW02 Lancaster Data Center Campus

Lancaster, Texas, United StatesPreconstruction
Capacity
500 MW
Planned / design
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 27, 2026
Most recent public record update

About STACK DFW02 Lancaster Data Center Campus

STACK is planning DFW02 as a large AI and cloud campus in Lancaster. Its current plan covers more than 300 MW of critical capacity with an expansion path beyond 500 MW. STACK Infrastructure is publicly identified in the project record for Lancaster, Dallas County, TX, US. The disclosed development record includes 193-acre campus; more than 300 MW currently planned; expansion path to more than 500 MW of critical capacity. Power and infrastructure include large powered campus in southern Dallas with scalable land and committed utility infrastructure. STACK presents DFW02 as expandable to more than 500 MW of critical capacity.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential500 MWDesign · STACK DFW02 Lancaster Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for STACK DFW02 Lancaster Data Center Campus; capacity remains classified as future potential.

Aug 27, 2026
STACK DFW02 project status and capacity disclosed
Completed
Master-planned campus with committed power and phased development
Forecast

Infrastructure

Electric GridPlanned Or Represented

500 MW

STACK presents DFW02 as expandable to more than 500 MW of critical capacity.

Site FacilityPlanned Or Represented

Large powered campus in southern Dallas with scalable land and committed utility infrastructure.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
DFW02 campus | Lancaster | Dallas County | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
500 MW
Design
Capacity Basis
STACK presents DFW02 as expandable to more than 500 MW of critical capacity.
Actual
Development Scale
193-Acre campus
Actual
Development Milestone
More than 300 MW currently planned
Actual
Power Arrangement
Expansion path to more than 500 MW of critical capacity.
Actual
Boundary Context
DFW02 campus | Lancaster | Dallas County | Texas
Actual