Skip to content
All records
Data center siteSite record

STACK DFW01 Plano Data Center Campus

Plano, Texas, United StatesPartially operational
Capacity
80 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK DFW01 Plano Data Center Campus

STACK DFW01 Plano Data Center Campus, also known as STACK DFW01, is a data center project in Plano, TX, US developed and operated by STACK Infrastructure. Established Plano campus with two operating data centers and an announced 48 MW expansion, producing an 80 MW campus boundary. Carrier-rich Dallas-area infrastructure with expansion capacity, resilient power and flexible deployment options.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load80 MWDesign · STACK DFW01 Plano Data Center Campus
Design80 MWDesign · STACK DFW01 Plano Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

80 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for STACK DFW01
Completed

Infrastructure

Electric GridEnergized

Carrier-rich Dallas-area infrastructure with expansion capacity, resilient power and flexible deployment options.

FiberEnergized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

10 facts
Location Context
STACK DFW01 | Plano | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
80 MW
Design
Capacity Basis
STACK Infrastructure publishes 80 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK DFW01 | Plano | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
80 MW
Design
Capacity Basis
80 MW facility or campus design capacity.
Actual
Site Area
45 acres
Actual
Carrier Networks
15+ networks
Actual