Capacity
32 MW
Planned / design
Lead participant
ODATA
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update
About ODATA DC QR01
All four campuses have operating capacity. QR01 is marketed at 32 MW, QR02 at 30 MW, QR03 has its first 72 MW building operating within a 300 MW five-building buildout, and QR04 has 12 MW operating within a 24 MW design. Participants include ODATA as developer, ODATA as operator, Aligned Data Centers as owner. Published specifications include 32 MW planned capacity. Development comprises Operating campus buildout (operational).
Program relationships
1 linkedRelated projects
Projects sharing a market, utility, or organization.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Future Potential32 MWActual · ODATA DC QR01
Development
1 phases · 0 milestonesOperating campus buildoutOperational
Current company page markets 32 MW IT power; utilization is not disclosed.
Infrastructure
No public infrastructure records are attached.
Project map
0 of 1 project point mappedInfrastructure facts
0
Mapped records
0
Capacity figures
0
No map point available
Facts & sources
Published claims and their source links.
Planned It Capacity32 MWActual
32 MW
Site Area52,350 square metresActual
52,350 square metres