Skip to content
All records
Data center siteSite record

ODATA DC QR01

Querétaro, QUE, MexicoOperating / Stabilized
Capacity
32 MW
Planned / design
Lead participant
ODATA
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About ODATA DC QR01

All four campuses have operating capacity. QR01 is marketed at 32 MW, QR02 at 30 MW, QR03 has its first 72 MW building operating within a 300 MW five-building buildout, and QR04 has 12 MW operating within a 24 MW design. Participants include ODATA as developer, ODATA as operator, Aligned Data Centers as owner. Published specifications include 32 MW planned capacity. Development comprises Operating campus buildout (operational).

Program relationships

1 linked

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential32 MWActual · ODATA DC QR01

Development

1 phases · 0 milestones
Operating campus buildoutOperational

Current company page markets 32 MW IT power; utilization is not disclosed.

Infrastructure

No public infrastructure records are attached.

Project map

0 of 1 project point mapped
Infrastructure facts
0
Mapped records
0
Capacity figures
0

No map point available

Facts & sources

Published claims and their source links.

3 facts
Planned It Capacity
32 MW
Actual
Site Area
52,350 square metres
Actual
Operational
True
Fact