NTT DATA Sacramento Data Center Campus, also known as NTT Sacramento Campus, is a data center project in Sacramento, CA, US associated with NTT DATA. Three-building Sacramento campus; 52.7 MW published campus critical IT load; CA3 provides 14 MW. Northern California campus with multiple 69 kV feeds, renewable-energy options and carrier-neutral connectivity.

Capacity

Reported capacity

Design

52.7 MW

Source

Reported capacity

Planned / design or future potential

52.7 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

52.7 MW is the operator-published facility or campus design boundary.

Participants

NTT DATA

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NTT Sacramento Campus | Sacramento | CA | US

Source

Location context

Actual

NTT Sacramento Campus | Sacramento | CA | US

Source

Location context

Actual

Sacramento, CA, US

Source

Development detail

Actual

Three building Sacramento campus; 52.7 MW published campus critical IT load; CA3 provides 14 MW.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NTT DATA publishes 52.7 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

52.7 MW facility or campus design capacity.

Source

Project identity

Actual

NTT Sacramento Campus

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

52.7 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Northern California campus with multiple 69 kV feeds, renewable-energy options and carrier-neutral connectivity.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
QTS SAC Sacramento Data Center

Partially operational · Sacramento, California, United States

Same locality: Sacramento

Compare in a collection