Menlo Digital MD-PHX1 Phoenix Campus

Phoenix, Arizona, United StatesPreconstruction
Evidence
Planned critical IT
180 MW
Updated
Oct 29, 2026

Menlo Digital plans a five-building, 180 MW critical-IT campus in Phoenix. The reported 257 MW utility feed is separate; neither figure represents verified operating capacity. Operator targets are Q4 2026 for substation/shell delivery and Q1 2027 for first halls. City records dated October 31, 2026 show issued Building 5 and Buildings 1–2 core/shell permits still open. An air application proposes 72 backup diesel engines for Buildings 1–3. Current title, the parcel transition and APS/SRP utility identity remain unresolved; the operator names SRP.

Capacity

Target critical IT capacity MW

Planned / design or future potential

180 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Five-building campus planPlanned

5 buildings

Ten 8 MW and ten 10 MW halls total 180 MW critical IT. Evidence: SRC-N220-MENLO-PHX1-S1

Milestones (8)
Council ratified two zoning stipulation modifications

Mar 20, 2024 · Recorded actual event

Phoenix City Council ratified stipulation modifications for PHO-2-24--Z-127-96-6 and PHO-1-24--Z-10-96-6 on March 20, 2024. These are zoning-case actions, not construction or operating approvals; case acreages must not be added to derive campus area.

Completed · Announced

Sources (2)
Water-main abandonment scope recorded complete

Apr 30, 2026 · Recorded actual event

Water-main abandonment permit 26000262 records completion on April 30, 2026. This narrow utility-work record does not establish campus completion, water allocation, cooling design or consumption.

Completed · Announced

Sources (1)
Council approved specified easement abandonment

Jul 1, 2026 · Recorded actual event

Phoenix City Council adopted Resolution 22388 on July 1, 2026 for ABND250032/project 23-1632, approving abandonment of specified drainage and waterline easements at 4801, 4805, 4809 and 4811 East Thistle Landing Drive. This is not a water-supply grant.

Completed · Announced

Sources (1)
Building 5 permit issued

Jul 2, 2026 · Recorded actual event

Project 23-1632 permit 26008627 was issued July 2, 2026. The October 31 snapshot records OPEN with no completion date; issuance does not establish completed construction or commissioning.

Completed · Announced

Sources (1)
Buildings 1–2 core/shell permit issued

Jul 17, 2026 · Recorded actual event

Project 23-1632 permit 26008875 was issued July 17, 2026. The October 31 snapshot records OPEN with no completion date; issuance does not establish completed construction or commissioning.

Completed · Announced

Sources (1)
New water-main permit issued

Aug 6, 2026 · Recorded actual event

Permit 26009402 was issued August 6, 2026 and remained OPEN in the October 31 snapshot. This is not evidence of a completed connection, water allocation or campus completion.

Completed · Announced

Sources (1)
Substation and shell delivery target.

Q4 2026 · Forecast / planned record

Forecast · Announced

Sources (1)
Data hall delivery target.

Q1 2027 · Forecast / planned record

Forecast · Announced

Sources (1)

Participants

Menlo Digital

Developer

Sources by role
Developer (1)

Capital & incentives

Capital claims

Reviewed menlo land history context

Reported rounded

The assessor record for parcel 301-84-762 shows a May 1, 2024 sale value of $77.3 million and a May 3, 2024 deed date, instrument 20240236145. This does not establish a per parcel price, full campus purchase price, buyer/seller direction or arms length transaction.

Source

Reviewed menlo tax preapproval context

Reported rounded

The Arizona Commerce Authority FY2025 report lists ME PHX Tech Campus, LLC as preapproved for its Computer Data Center Tax Incentive Program with a $50 million plus statutory minimum aggregate investment threshold over up to five years. This is not actual expenditure, a subsidy amount or proof of completed qualification.

Source

Site & development

Site location

Reported rounded

4801–4811 East Thistle Landing Drive, Phoenix 85044; 38.3 acres.

Source

Land and site control context

Reported rounded

Operator identifies 38.3-acre redevelopment site. Legal title vehicle not verified.

Source

Planned total building area sqft

Forecast

Operator development program specifies 1,022,400 square feet across five two story buildings, with 204,480 square feet per building; planned building area, not delivered or IT-whitespace area.

Source

Reviewed menlo building permits context

Reported rounded

As of the October 31, 2026 records, project 23-1632 includes Building 5 permit 26008627, issued July 2, 2026, and Buildings 1–2 core/shell permit 26008875, issued July 17, 2026. Both records are OPEN with no completion date. Issuance does not establish completed construction or commissioning.

Source

Reviewed menlo construction participants context

Reported rounded

The October 31, 2026 permit snapshot lists CLAYCO INC in the company fields for the Building 5 and Buildings 1–2 core/shell permits. Utility only foundation permit 26005012 lists SUNDT CONSTRUCTION; water main permits list RICOR INC. These are scoped permit associated company fields, not proof each party is the whole campus EPC or that construction is complete.

Source

Reviewed menlo air dust construction context

Reported rounded

The county separately lists dust facility F054873, ME-PHX DC Buildings 1–5, associated with Clune Construction Company LP and dust application D0063915, for data center campus construction at the southeast corner of 48th Street and Thistle Drive. The dust record’s Operating label is a dust facility administrative status, not proof that the data center or any IT capacity is operating, and not by itself confirmation of ongoing construction on the observation date. No contract value, exact whole campus EPC scope or completed building is established.

Source

Reviewed menlo air building1 target context

Reported rounded

The June 2026 air application targets commercial operation of Building 1's 24 emergency generators in Q2 2027. This is a dated forecast distinct from the operator's Q1 2027 first hall target; it establishes neither achieved commissioning nor a verified schedule change.

Source

Technical specifications

Reviewed menlo siteworks water context

Reported rounded

Water main abandonment permit 26000262 was issued January 7, 2026 and recorded DONE with an April 30, 2026 completion date. New water main permit 26009402 was issued August 6, 2026 and recorded OPEN in the October 31 snapshot. These records do not establish water allocation, cooling design or campus completion.

Source

Additional project facts

Operator named utility provider

Reported rounded

Menlo Digital identifies Salt River Project as MD-PHX1 utility provider; this does not independently establish an executed supply agreement or energization.

Source

Reviewed menlo identity owner context

Reported rounded

The assessor’s owner field lists ME PHX TECH CAMPUS LLC for parcel 301-84-762 at 4801 East Thistle Landing Drive. The 2023 zoning application identifies parcels 301-84-762, 301-84-763, 301-84-764 and 301-84-765. This is not a title certification or verification of the subsequent parcel transition.

Source

Reviewed menlo zoning history context

Reported rounded

Phoenix City Council ratified stipulation modifications for PHO-2-24--Z-127-96-6 and PHO-1-24--Z-10-96-6 on March 20, 2024. These are zoning case actions, not construction or operating approvals; case acreages must not be added to derive campus area.

Source

Reviewed menlo easement action context

Reported rounded

Phoenix City Council adopted Resolution 22388 on July 1, 2026 for ABND250032/project 23-1632, approving abandonment of specified drainage and waterline easements at 4801, 4805, 4809 and 4811 East Thistle Landing Drive. This is not a water supply grant.

Source

Reviewed menlo historical design team context

Reported rounded

The 2023 conceptual architectural site plan submitted with PHO-2-24 identifies Gensler and Menlo Equities, with a southeast substation and northeast public open space. The plan is marked NOT FOR CONSTRUCTION; it does not establish current executed architect contracts or as built amenities.

Source

Reviewed menlo air identity context

Reported rounded

Maricopa County associates MD-PHX1 facility F057422 at 4801 East Thistle Landing Drive, parcel 301-84-899, with ME PHX Tech Campus LLC. This is a facility association, not legal title certification or resolution of the parcel transition from the older assessor/zoning parcel set.

Source

Reviewed menlo air permit chronology context

Reported rounded

The October 1, 2026 supplement describes the June 2026 non-Title V application as under review at that time. An issued permit has not been independently verified in this review.

Source

Reviewed menlo air engine revision context

Reported rounded

The October 1, 2026 supplement proposes 72 Caterpillar C175-16 emergency diesel engines, 24 per building for Buildings 1–3, and changes the proposed configuration to SCR on all 72 engines. This is an application proposal, not evidence of installation or operation, and excludes the other two campus buildings.

Source

Reviewed menlo air engine specs context

Reported rounded

Each proposed engine is rated 4,423 bhp with a 3,000 ekW generator set. The supplement describes Miratech SCR designed to meet the Tier 4 NOx standard of 0.5 g/bhp hr; this is aftertreatment performance, not Tier 4 engine certification or proof of actual installation. Backup generator ratings are not IT capacity.

Source

Reviewed menlo air source scope context

Reported rounded

The June 2026 air application addresses emergency backup engines for Buildings 1–3 of a five building campus. The applicant describes utility line power and no onsite baseload generation, and says Buildings 4–5 emergency configurations await tenant specific needs, finalized design and future permitting. This is a dated applicant statement, not evidence that Buildings 4–5 can operate without permits or currently lack tenants.

Source

Reviewed menlo air consultant context

Reported rounded

SWCA Environmental Consultants prepared the June 2026 air permit application and October 1 supplement on behalf of ME-PHX Tech Campus LLC. This establishes an air quality consultant role only, not architect, EPC or general contractor scope.

Source

Infrastructure & permits

Technical details (2)
Utility service

Reported context

Developer describes secured 257 MW utility capacity and dedicated on-site substation; executed allocation document not reviewed.

Electric grid

Planned or represented

257 MW

Operator-reported utility capacity, not campus IT or verified energized load.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Aligned Phoenix PHX01–PHX03 Data Center Campus

Partially operational · Phoenix, Arizona, United States

Same locality: Phoenix

Compare in a collection
Iron Mountain AZP-1 Phoenix Data Center

Operating · Phoenix, Arizona, United States

Same locality: Phoenix

Compare in a collection
Iron Mountain AZP-2 Phoenix Data Center

Partially operational · Phoenix, Arizona, United States

Same locality: Phoenix

Compare in a collection
Iron Mountain AZP-3 Phoenix Data Center

Operating · Phoenix, Arizona, United States

Same locality: Phoenix

Compare in a collection