Iron Mountain AZP-2 Phoenix Data Center

Phoenix, Arizona, United StatesPartially operational
Capacity
48 MW
Planned critical IT
Lead participant
Iron Mountain Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Iron Mountain AZP-2 Phoenix Data Center

Iron Mountain AZP-2 Phoenix Data Center, also known as Iron Mountain AZP-2, is a data center project in Phoenix, AZ, US. Purpose-built Phoenix facility with up to 48 MW of maximum IT load across approximately 547,000 square feet at full build-out. Eight potential 6 MW data halls, BREEAM design certification, high-density support, and a 100 Gbps dark-fiber ring to other Iron Mountain Phoenix facilities. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load48 MWDesign · Iron Mountain AZP-2 Phoenix Data Center
It Load46.5 MWDesign · Iron Mountain AZP-2 Phoenix Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

Iron Mountain AZP-2 Phoenix Data Center, also known as Iron Mountain AZP-2, is a data center project in Phoenix, AZ, US. Purpose-built Phoenix facility with up to 48 MW of maximum IT load across approximately 547,000 square feet at full build-out. Eight potential 6 MW data halls, BREEAM design certification, high-density support, and a 100 Gbps dark-fiber ring to other Iron Mountain Phoenix facilities. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

46.5 MW

46.5 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility-power or design boundary is retained as a separate assertion and is not presented as current operating IT.

FiberOperational

Eight potential 6 MW data halls, BREEAM design certification, high-density support, and a 100 Gbps dark-fiber ring to other Iron Mountain Phoenix facilities.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
AZP-2 | Phoenix | AZ | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
48 MW
Design
Capacity Basis
Iron Mountain publishes 48 MW for the AZP-2 facility record boundary.
Actual
Location Context
AZP-2 | Phoenix | AZ | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
46.5 MW
Design
Capacity Basis
46.5 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Operator Or Developer
Iron Mountain Data Centers
Actual
Project Location
Phoenix, AZ, US
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
It load
Actual
Capacity Basis
46.5 MW is the Q2 2026 SEC-reported leaseable operating capacity. The larger marketed facility power or design boundary is retained as a separate assertion and is not presented as current operating IT.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Energy Matching
Operator states 100% matched renewable energy where applicable
Actual
Sec Capacity Comparison
Q2 2026 leaseable and development schedules reviewed