Skip to content
All records
Data center siteSite record

MC Digital Realty NRT14

Inzai, 12, JapanOperating / Stabilized
Capacity
No public figure
Lead participant
No public role record
Last updated
Aug 26, 2026
Most recent public record update

About MC Digital Realty NRT14

MC Digital Realty NRT14 is the third physical facility at NRT campus: maximum 31 MW server power, 22,800 sqm, about 2,800 racks, and hybrid liquid/air cooling.

Program relationships

1 linked

Projects sharing a market, utility, or organization.

2 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
NRT14 operationsOperational

31 MW maximum server power; six above-ground floors.

1 building

Apr 1, 2024
NRT14 construction began
Completed

Infrastructure

No public infrastructure records are attached.

Project map

0 of 1 project point mapped
Infrastructure facts
0
Mapped records
0
Capacity figures
0

No map point available

Facts & sources

Published claims and their source links.

1 facts
Project Identity
MC Digital Realty NRT14
Fact