Skip to content
All records
Data center siteSite record

Colt Tokyo Inzai 4 Data Centre

Inzai, Chiba, JapanOperating / Stabilized
Capacity
20 MW
Planned critical IT
Lead participant
Colt Data Centre Services
Developer
Last updated
Aug 29, 2026
Most recent public record update

About Colt Tokyo Inzai 4 Data Centre

Colt Tokyo Inzai 4 Data Centre is a separately tracked building in Colt’s Inzai cluster. Its 20 MW facility boundary is not combined with adjacent Inzai sites or treated as measured tenant load. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load20 MWDesign · Colt Tokyo Inzai 4 Data Centre
It Load20 MWDesign · Colt Tokyo Inzai 4 Data Centre

Development

1 phases · 2 milestones
Operating facility and documented expansionOperational

Colt Tokyo Inzai 4 Data Centre is a separately tracked building in Colt’s Inzai cluster. Its 20 MW facility boundary is not combined with adjacent Inzai sites or treated as measured tenant load. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Oct 2, 2025
Inzai 4 launched
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridPlanned Or Represented

20 MW

20 MW is the published future facility or full-build IT boundary; it is not operating load.

FiberPlanned Or Represented

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemPlanned Or Represented

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
Colt Inzai 4 | Inzai | Chiba | JP
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
20 MW
Design
Capacity Basis
Colt Data Centre Services publishes 20 MW of IT power for this project boundary.
Actual
Location Context
Colt Inzai 4 | Inzai | Chiba | JP
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
20 MW
Design
Capacity Basis
20 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Colt Data Centre Services
Actual
Project Location
Inzai, Chiba, JP
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
20 MW is the published future facility or full build IT boundary; it is not operating load.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Inzai Facility Number
4 facility
Actual