Colt Tokyo Inzai 5 Data Centre

Inzai, Chiba, JapanPreconstruction
Capacity
32 MW
Planned critical IT
Lead participant
Colt Data Centre Services
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Colt Tokyo Inzai 5 Data Centre

Colt Inzai 5 is the planned fifth Colt site in Inzai City. The 32 MW and 30,159-square-metre figures are full-build design attributes; current construction and service dates require continuing verification. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load32 MWDesign · Colt Tokyo Inzai 5 Data Centre
Future Potential32 MWDesign · Colt Tokyo Inzai 5 Data Centre

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

Colt Inzai 5 is the planned fifth Colt site in Inzai City. The 32 MW and 30,159-square-metre figures are full-build design attributes; current construction and service dates require continuing verification. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridPlanned Or Represented

32 MW

32 MW is the published future facility or full-build IT boundary; it is not operating load.

FiberPlanned Or Represented

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemPlanned Or Represented

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
Colt Inzai 5 | Inzai | Chiba | JP
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
32 MW
Design
Capacity Basis
Colt Data Centre Services publishes 32 MW of IT power for this project boundary.
Actual
Location Context
Colt Inzai 5 | Inzai | Chiba | JP
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
32 MW
Design
Capacity Basis
32 MW is the published future facility or full build IT boundary; it is not operating load.
Actual
Operator Confirmed
Colt Data Centre Services
Actual
Project Location
Inzai, Chiba, JP
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
32 MW is the published future facility or full build IT boundary; it is not operating load.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Gross Floor Area
30,159 square metres
Design