Iron Mountain CHN-2 Chennai Data Center

Chennai, TN, IndiaPreconstruction
Capacity
19 MW
Planned critical IT
Lead participant
Iron Mountain Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Iron Mountain CHN-2 Chennai Data Center

CHN-2 is the separate second Ambattur building, planned for 19 MW across eight data halls from 2028. It shares the 68 MVA campus feed with CHN-1; the utility feed and 42 MW campus total are not treated as CHN-2 operating capacity. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load19 MWDesign · Iron Mountain CHN-2 Chennai Data Center
Future Potential19 MWDesign · Iron Mountain CHN-2 Chennai Data Center

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

CHN-2 is the separate second Ambattur building, planned for 19 MW across eight data halls from 2028. It shares the 68 MVA campus feed with CHN-1; the utility feed and 42 MW campus total are not treated as CHN-2 operating capacity. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridPlanned Or Represented

19 MW

19 MW is the published future facility or full-build design boundary; it is not operating IT load.

FiberPlanned Or Represented

AI-ready facility planned with N+2C redundancy, A/B underground feeds, liquid-cooling support and a dedicated campus substation.

Cooling SystemPlanned Or Represented

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

20 facts
Location Context
CHN-2 | Chennai | TN | IN
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
19 MW
Design
Capacity Basis
Iron Mountain publishes 19 MW for the CHN-2 facility record boundary.
Actual
Location Context
CHN-2 | Chennai | TN | IN
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
19 MW
Design
Capacity Basis
19 MW is the published future facility or full build design boundary;
Actual
Operator Or Developer
Iron Mountain Data Centers
Actual
Project Location
Chennai, TN, IN
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
19 MW is the published future facility or full build design boundary;
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Renewable Energy Matching
Operator states 100% matched renewable energy where applicable
Actual
Sec Capacity Comparison
Q2 2026 leaseable and development schedules reviewed
Actual
Building Area
396,075 square feet
Design
Data Halls
8 halls
Design
Target Opening
2028
Forecast