Iron Mountain CHN-2 Chennai Data Center
Preconstruction · Chennai, TN, India
CHN-1 is the first of two Ambattur buildings, designed for 23.2 MW across eight data halls and phased service during 2026. It shares a 68 MVA main feed and campus substation with CHN-2, but the 42 MW campus total is not assigned to CHN-1 or presented as operating IT before commissioning. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Projects sharing a market, utility, or organization.
Preconstruction · Chennai, TN, India
CHN-1 is the first of two Ambattur buildings, designed for 23.2 MW across eight data halls and phased service during 2026. It shares a 68 MVA main feed and campus substation with CHN-2, but the 42 MW campus total is not assigned to CHN-1 or presented as operating IT before commissioning. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
23.2 MW
23.2 MW is the published future facility or full-build design boundary; it is not operating IT load.
AI-ready facility with a dedicated campus substation, liquid-cooling support, A/B underground feeds, dark fiber and redundant meet-me rooms.
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
No map point available
Published claims and their source links.