Skip to content
All records
Data center siteSite record

CyrusOne MAD1 Madrid Data Center

Alcobendas, Community of Madrid, SpainUnder construction
Capacity
18 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne MAD1 Madrid Data Center

CyrusOne MAD1 Madrid Data Center, also known as CyrusOne MAD1, is a data center project in Alcobendas, Community of Madrid, ES associated with CyrusOne. Five-acre site; one two-story building; 6,000 square metres of technical space; 18 MW total IT load. Madrid development with renewable-energy design, air-cooled closed-loop chillers and onsite solar generation. 18 MW is the operator-published future facility or full-build design boundary.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load18 MWDesign · CyrusOne MAD1 Madrid Data Center
Future Potential18 MWDesign · CyrusOne MAD1 Madrid Data Center

Development

1 phases · 1 milestones
Development, permitting and phased deliveryUnder Construction

18 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.

Apr 27, 2026
Integrated environmental authorization opened to public review
Completed

Infrastructure

Electric GridPlanned Or Represented

Madrid development with renewable-energy design, air-cooled closed-loop chillers and onsite solar generation.

Cooling SystemPlanned Or Represented

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
CyrusOne MAD1 | Alcobendas | Community of Madrid | ES
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
18 MW
Design
Capacity Basis
CyrusOne publishes 18 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne MAD1 | Alcobendas | Community of Madrid | ES
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
18 MW
Design
Capacity Basis
18 MW is the operator published future facility or full build design boundary.
Actual
Project Boundary
CyrusOne MAD1
Actual
Location Context
Alcobendas, Community of Madrid, ES
Actual
Lifecycle Status
Construction
Actual
Development Detail
Five acre site; one two story building; 6,000 square metres of technical space; 18 MW total IT load.
Actual
Capacity Basis
18 MW is the operator published future facility or full build design boundary.
Actual