Cartis diligence evidence schedule
Equinix MD5 Alcobendas
PRJ-1265 · Site · Alcobendas, Community of Madrid, Spain
Captured 2026-09-13T01:09:22.313Z · Record last updated 2026-09-12
SHA-256: e49d36a5c73567c387f28ea0fa8e55c5cac88d1d56a14b006b2d2f0842d7f899
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Equinix MD5 is an operating IBX data center at the company’s Alcobendas campus near Madrid, officially inaugurated in May 2026. The facility provides more than 4,400 square metres of colocation space and was announced with N+1 electrical redundancy, N+1 cooling redundancy and a 5+1 backup-generator configuration. Equinix states that its Spanish facilities, including MD5, are covered by 100% renewable energy and cites availability above 99.999%. The company’s €460 million investment figure applies to the broader Alcobendas campus rather than MD5 alone.
Headline: —
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Colocation Area Minimum · 4,400 square meters
actual · Equinix MD5 Alcobendas (project)
Claim 158143 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Campus Investment Context · €460,000,000
actual · Equinix MD5 Alcobendas (project)
Claim 158144 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Electrical Redundancy · N+1
actual · Equinix MD5 Alcobendas (project)
Claim 158145 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Cooling Redundancy · N+1
actual · Equinix MD5 Alcobendas (project)
Claim 158146 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Backup Generator Configuration · 5+1
actual · Equinix MD5 Alcobendas (project)
Claim 158147 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Renewable Energy Coverage · 100 percent
actual · Equinix MD5 Alcobendas (project)
Claim 158148 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Availability Claim Minimum · 100 percent
actual · Equinix MD5 Alcobendas (project)
Claim 158149 · Review: Approved · Claim date: Not published
- Equinix refuerza su oferta en colocation con la inauguración de MD5 en Alcobendas
Equinix · Document date: 2026-05-22 · Primary
https://newsroom.equinix.com/2026-05-22-Equinix-refuerza-su-oferta-en-colocation-con-la-inauguracion-de-MD5-en-Alcobendas
Counterparties and capital
Equinix, Inc. · Developer, Operator · CMP-0222
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.