CyrusOne CIN5 Lebanon Data Center Campus

Lebanon, Ohio, United StatesOperating / Stabilized
Capacity
12 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne CIN5 Lebanon Data Center Campus

CyrusOne CIN5 Lebanon Data Center Campus, also known as CyrusOne CIN5, is a data center project in Lebanon, OH, US associated with CyrusOne. 123-acre campus; 400,000 square feet of technical IT space; 12 MW IT capacity; additional build-to-suit land. Cincinnati-region campus with high-performance-computing capability, efficient cooling and multiple security layers.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load12 MWDesign · CyrusOne CIN5 Lebanon Data Center Campus
Design12 MWDesign · CyrusOne CIN5 Lebanon Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

12 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for CyrusOne CIN5
Completed

Infrastructure

Electric GridEnergized

Cincinnati-region campus with high-performance-computing capability, efficient cooling and multiple security layers.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
CyrusOne CIN5 | Lebanon | OH | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
12 MW
Design
Capacity Basis
CyrusOne publishes 12 MW of total IT capacity for CIN5.
Actual
Location Context
CyrusOne CIN5 | Lebanon | OH | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne CIN5
Actual
Location Context
Lebanon, OH, US
Actual
Lifecycle Status
Operating
Actual
Development Detail
123-Acre campus; 400,000 square feet of technical IT space; 12 MW IT capacity; additional build to suit land.
Actual
Capacity Basis
12 MW facility or campus design capacity.
Actual