CyrusOne CIN2 Cincinnati Data Center

Cincinnati, Ohio, United StatesOperating / Stabilized
Capacity
11 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne CIN2 Cincinnati Data Center

CyrusOne CIN2 Cincinnati Data Center, also known as CyrusOne CIN2, is a data center project in Cincinnati, OH, US associated with CyrusOne. Primary Cincinnati carrier hotel; 143,778 square feet of technical IT space; 11 MW total IT capacity. Enterprise facility with high-performance-computing capability, redundant chilled-water cooling and broad carrier access.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load11 MWDesign · CyrusOne CIN2 Cincinnati Data Center
Design11 MWDesign · CyrusOne CIN2 Cincinnati Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

11 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for CyrusOne CIN2
Completed

Infrastructure

Electric GridEnergized

Enterprise facility with high-performance-computing capability, redundant chilled-water cooling and broad carrier access.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
CyrusOne CIN2 | Cincinnati | OH | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
11 MW
Design
Capacity Basis
CyrusOne publishes 11 MW of total IT capacity for CIN2.
Actual
Location Context
CyrusOne CIN2 | Cincinnati | OH | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
11 MW
Design
Capacity Basis
11 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne CIN2
Actual
Location Context
Cincinnati, OH, US
Actual
Lifecycle Status
Operating
Actual
Development Detail
Primary Cincinnati carrier hotel; 143,778 square feet of technical IT space; 11 MW total IT capacity.
Actual
Capacity Basis
11 MW facility or campus design capacity.
Actual