Beacon Foothills Artificial Intelligence Hub
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
- Utility
- Alberta Electric System Operator
Beacon is proposing an artificial-intelligence data center campus in Foothills County, Alberta. The announced 400 MW figure describes onsite generation capacity; a separate grid directory lists a proposed 400 MW load.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
2 buildings
Official page states two five-storey buildings; unnamed buildings remain phase-level.
Participants
Other participants (3)
Additional project facts
Infrastructure & permits
Technical details (2)
Potential or planned
400 MW
Official generation label; technology and permitting not public in reviewed primary source.
Potential or planned
400 MW
Secondary directory reports P2926; primary queue record pending.
Project map
Project map
1 of 1 project point mappedPublic-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Under construction limited scope · Sturgeon County, Alberta, Canada
Shared participant: Alberta Electric System Operator · Same market: Alberta, Canada
Compare in a collectionProposed · Olds, Alberta, Canada
Shared participant: Alberta Electric System Operator · Same market: Alberta, Canada
Compare in a collection