Cartis diligence evidence schedule

AWS Susquehanna / Cumulus Campus

PRJ-AWS-SUSQUEHANNA · Site · Salem Township, Luzerne County, Pennsylvania, United States

Record last updated Oct 28, 2026

Scope and capacity

AWS owns the former Cumulus data-center campus beside the Susquehanna nuclear station in Salem Township. The $650 million acquisition was announced in March 2024, and the township describes the development as approximately 1,200 acres. Gray identifies itself as the construction lead for the continuing development, with that work beginning in 2025. Talen’s latest quarterly filing reports an April 2026 contractual transition to the revised PPA; that disclosure does not establish completion of all physical load-conversion work. Its maximum 1,920 MW supply commitment extends through 2042 and can also serve other Pennsylvania sites; it is not the campus’s measured IT load. The original 960 MW development potential is likewise not an operating-capacity figure. The revised arrangement names Talen as retail supplier and PPL for transmission and delivery through the PJM grid. The former behind-the-meter ISA appeal was voluntarily dismissed in January 2026. For PHL100, the river-basin commission approved up to 0.129 million gallons per day of consumptive use on a 30-day average, with Pennsylvania-American Water’s Berwick system as the primary supply. The approval covers evaporative cooling, not a measurement of actual consumption. A separate air-permit application proposes additional emergency generators; their ratings must not be counted as IT capacity. Current operating IT load, parcel-level expansion limits and the final disposition of that generator application remain unverified.

Headline: 1,920 MW Contracted

This record and AWS Salem Township cover development beside the Susquehanna nuclear plant and the Talen supply arrangement. Their supply figures overlap and are not additive.

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Jump to a claim (27)

Campus purchase price · $650,000,000

Completed March 2024 campus acquisition; not expansion capex · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-011 · Recorded claim type: Completed March 2024 campus acquisition; not expansion capex · Review: Approved · Claim date: Mar 4, 2024

  1. Business update: Cumulus campus sale to AWS

    Talen Energy · Document date: Mar 4, 2024 · Supports

    Source reference: SUS-R01 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d

Original campus capacity · 960 MW

Original March 2024 development potential; not operating IT · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-012 · Recorded claim type: Original March 2024 development potential; not operating IT · Review: Approved · Claim date: Mar 4, 2024

Headline treatment: Not included in reviewed operating IT capacity

  1. Business update: Cumulus campus sale to AWS

    Talen Energy · Document date: Mar 4, 2024 · Supports

    Source reference: SUS-R01 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d

Original March 2024 minimum power commitment ramp · 120 MW increments

Historical original contract terms; not reaffirmed for revised PPA · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-013 · Recorded claim type: Historical original contract terms; not reaffirmed for revised PPA · Review: Approved · Claim date: Mar 4, 2024

Headline treatment: Separate claim, not added to the headline

  1. Business update: Cumulus campus sale to AWS

    Talen Energy · Document date: Mar 4, 2024 · Supports

    Source reference: SUS-R01 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d

Original March 2024 AWS power cap option · 480 MW

Historical original one time option; not reaffirmed for revised PPA · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-014 · Recorded claim type: Historical original one time option; not reaffirmed for revised PPA · Review: Approved · Claim date: Mar 4, 2024

  1. Business update: Cumulus campus sale to AWS

    Talen Energy · Document date: Mar 4, 2024 · Supports

    Source reference: SUS-R01 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d

Expanded broader AWS PPA full quantity, not campus IT or current delivered load · 1,920 MW

Contracted maximum for adjacent campus and potential other Pennsylvania sites · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-015 · Recorded claim type: Contracted maximum for adjacent campus and potential other Pennsylvania sites · Review: Approved · Claim date: Jun 11, 2025

Headline treatment: Selected headline

  1. Talen Energy expands nuclear energy relationship with Amazon

    Talen Energy · Document date: Jun 11, 2025 · Supports

    Source reference: SUS-01 · Company primary

    Source URL

    https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/

PPA term end · 2042

Contract term · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-016 · Recorded claim type: Contract term · Review: Approved · Claim date: Jun 11, 2025

  1. Talen Energy expands nuclear energy relationship with Amazon

    Talen Energy · Document date: Jun 11, 2025 · Supports

    Source reference: SUS-01 · Company primary

    Source URL

    https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/

Nuclear station gross capacity · Approximately 2,500 MW

Separate generation nameplate · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-017 · Recorded claim type: Separate generation nameplate · Review: Approved · Claim date: Not stated

Headline treatment: Generation capacity; not IT capacity

  1. Powering Data

    Talen Energy · Document date: Not stated · Supports

    Source reference: SUS-02 · Company primary

    Source URL

    https://www.talenenergy.com/powering-data/

Talen net nuclear interest · Approximately 2,200 MW

Owner share · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-018 · Recorded claim type: Owner share · Review: Approved · Claim date: Not stated

Headline treatment: Generation capacity; not IT capacity

  1. Powering Data

    Talen Energy · Document date: Not stated · Supports

    Source reference: SUS-02 · Company primary

    Source URL

    https://www.talenenergy.com/powering-data/

Delivery structure · Grid delivered with co located and other Pennsylvania operations structure

Revised · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-B4-019 · Recorded claim type: Revised · Review: Approved · Claim date: Jun 11, 2025

  1. Talen Energy expands nuclear energy relationship with Amazon

    Talen Energy · Document date: Jun 11, 2025 · Supports

    Source reference: SUS-01 · Company primary

    Source URL

    https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/

  2. Powering Data

    Talen Energy · Document date: Not stated · Supports

    Source reference: SUS-02 · Company primary

    Source URL

    https://www.talenenergy.com/powering-data/

Broader AWS contractual PPA transition, not physical conversion completion or IT commissioning · 2026-04 month

Achieved contractual transition in April 2026 · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-01 · Recorded claim type: Achieved contractual transition in April 2026 · Review: Approved · Claim date: Aug 5, 2026

Headline treatment: Separate claim, not added to the headline

  1. Q2 2026 Form 10-Q

    Talen Energy · Document date: Aug 5, 2026 · Supports

    Source reference: SUS-R02 · Primary

    Source URL

    https://ir.talenenergy.com/node/9536/html

Broader AWS PPA electricity delivery counterparties · PPL Electric Utilities: transmission and delivery; Talen: retail electric supplier. Arrangement includes the adjacent campus and may serve other Pennsylvania sites. roles

Revised grid delivered supply · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-02 · Recorded claim type: Revised grid delivered supply · Review: Approved · Claim date: Jun 11, 2025

  1. Talen Energy expands nuclear energy relationship with Amazon

    Talen Energy · Document date: Jun 11, 2025 · Supports

    Source reference: SUS-01 · Company primary

    Source URL

    https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/

  2. Q2 2026 Form 10-Q

    Talen Energy · Document date: Aug 5, 2026 · Supports

    Source reference: SUS-R02 · Primary

    Source URL

    https://ir.talenenergy.com/node/9536/html

Broader 1,920 MW AWS PPA full quantity target, not campus IT · 2032

No later than 2032; forecast may accelerate · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-03 · Recorded claim type: No later than 2032; forecast may accelerate · Review: Approved · Claim date: Jun 11, 2025

  1. Talen Energy expands nuclear energy relationship with Amazon

    Talen Energy · Document date: Jun 11, 2025 · Supports

    Source reference: SUS-01 · Company primary

    Source URL

    https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/

Original behind the meter ISA Amendment appeal disposition · Talen voluntarily dismissed this appeal in January 2026. This is not a finding that all campus permits or co location proceedings are closed. status

Reported achieved legal event · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-04 · Recorded claim type: Reported achieved legal event · Review: Approved · Claim date: Not stated

  1. 2025 annual report to shareholders, including Form 10-K

    Talen Energy / SEC · Document date: Not stated · Supports

    Source reference: SUS-R03 · Primary

    Source URL

    https://www.sec.gov/Archives/edgar/data/1622536/000162253626000025/tln-2025annualreporttoshar.htm

Existing Amazon campus and proposed expansion air application address · 1125 Electron Avenue, Berwick, PA 18603 address

Official permit application address · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-05 · Recorded claim type: Official permit application address · Review: Approved · Claim date: Aug 15, 2026

  1. Plan approval application 40-00158C

    Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports

    Source reference: SUS-R06 · Primary

    Source URL

    https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html

AWS/Talen Cumulus area described in July 2026 municipal testimony · 1,200 acres

Municipal development description, not a parcel or deed survey · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-06 · Recorded claim type: Municipal development description, not a parcel or deed survey · Review: Approved · Claim date: Not stated

  1. Amy Evans testimony on data centers

    Salem Township Manager / Center for Rural Pennsylvania · Document date: Not stated · Supports

    Source reference: SUS-R08 · Primary

    Source URL

    https://www.rural.pa.gov/Resources/PDFs/news/Evans%20Data%20Center%20Testimony%207.29.26.pdf?t=20260722

AWS development construction lead near Route 11 east of Cumulus Boulevard · Gray Development; construction role, not campus ownership organization

Contractor reported · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-07 · Recorded claim type: Contractor reported · Review: Approved · Claim date: Not stated

  1. Salem Township Data Center Development

    Gray · Document date: Not stated · Supports

    Source reference: SUS-R10 · Primary

    Source URL

    https://www.gray.com/salem-township-data-center-development/

  2. Official township home page: AWS construction contact

    Salem Township · Document date: Not stated · Supports

    Source reference: SUS-R11 · Primary

    Source URL

    https://www.salemtwp.org/

Gray led AWS expansion construction start, not original Cumulus start · 2025

Contractor reported achieved · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-08 · Recorded claim type: Contractor reported achieved · Review: Approved · Claim date: Not stated

  1. Salem Township Data Center Development

    Gray · Document date: Not stated · Supports

    Source reference: SUS-R10 · Primary

    Source URL

    https://www.gray.com/salem-township-data-center-development/

  2. Official township home page: AWS construction contact

    Salem Township · Document date: Not stated · Supports

    Source reference: SUS-R11 · Primary

    Source URL

    https://www.salemtwp.org/

PHL100 approved consumptive use ceiling, not actual use or withdrawal · 0.129 MGD (30-day average)

SRBC approval maximum; 30-day average · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-09 · Recorded claim type: SRBC approval maximum; 30-day average · Review: Approved · Claim date: Mar 12, 2026

  1. PHL100 Data Center Campus: approval docket 20260301

    Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports

    Source reference: SUS-R04 · Primary

    Source URL

    https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301

  2. Water Application and Approval Viewer: PHL100

    Susquehanna River Basin Commission · Document date: Not stated · Supports

    Source reference: SUS-R05 · Primary

    Source URL

    https://www.srbc.gov/waav/Search/Details?approvalID=21373&pendingNumber=2025-159&sourceID=null

PHL100 primary approved water supply · Pennsylvania-American Water Company, Berwick System; approved for potable/sanitary and consumptive uses, not a measured delivery volume utility

Approved source arrangement · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-10 · Recorded claim type: Approved source arrangement · Review: Approved · Claim date: Mar 12, 2026

Headline treatment: Separate claim, not added to the headline

  1. PHL100 Data Center Campus: approval docket 20260301

    Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports

    Source reference: SUS-R04 · Primary

    Source URL

    https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301

PHL100 approved backup water source arrangements · Production Well 1 (temporary backup); Veolia Bloomsburg; Schuylkill County Municipal Authority; Bob Smith’s Clean Water. Permitted purposes differ by source under docket 20260301. sources

Temporary or backup approved arrangements · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-11 · Recorded claim type: Temporary or backup approved arrangements · Review: Approved · Claim date: Mar 12, 2026

  1. PHL100 Data Center Campus: approval docket 20260301

    Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports

    Source reference: SUS-R04 · Primary

    Source URL

    https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301

PHL100 authorized cooling water use · Evaporative cooling and incidental uses; authorization does not establish actual consumption or the operating configuration of each building system

Authorized use · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-12 · Recorded claim type: Authorized use · Review: Approved · Claim date: Mar 12, 2026

  1. PHL100 Data Center Campus: approval docket 20260301

    Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports

    Source reference: SUS-R04 · Primary

    Source URL

    https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301

40-00158 C proposed additional critical emergency generators · 84 × 2,750 KW; installation unverified; backup ratings are not IT capacity equipment

Permit application; installation unverified · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-13 · Recorded claim type: Permit application; installation unverified · Review: Approved · Claim date: Aug 15, 2026

  1. Plan approval application 40-00158C

    Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports

    Source reference: SUS-R06 · Primary

    Source URL

    https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html

40-00158 C proposed additional auxiliary emergency generators · 2 × 400 KW; installation unverified; backup ratings are not IT capacity equipment

Permit application; installation unverified · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-14 · Recorded claim type: Permit application; installation unverified · Review: Approved · Claim date: Aug 15, 2026

  1. Plan approval application 40-00158C

    Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports

    Source reference: SUS-R06 · Primary

    Source URL

    https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html

40-00158 C proposed emergency generator fuel · Diesel / hydrotreated vegetable oil for proposed backup equipment; installation and final application disposition unverified fuel

Proposed application limits · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-15 · Recorded claim type: Proposed application limits · Review: Approved · Claim date: Aug 15, 2026

  1. Plan approval application 40-00158C

    Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports

    Source reference: SUS-R06 · Primary

    Source URL

    https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html

40-00158 C proposed additional bulk fuel storage · 3 × 12,000 US gallons, excluding generator belly tanks; installation and final application disposition unverified equipment

Permit application · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-16 · Recorded claim type: Permit application · Review: Approved · Claim date: Aug 15, 2026

Headline treatment: Generation capacity; not IT capacity

  1. Plan approval application 40-00158C

    Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports

    Source reference: SUS-R06 · Primary

    Source URL

    https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html

Original Cumulus historical fiber provision · Redundant fiber network described by the seller in March 2024; current carriers, bandwidth and diverse entry routes unverified network

Seller description, March 2024 · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-17 · Recorded claim type: Seller description, March 2024 · Review: Approved · Claim date: Mar 4, 2024

  1. Business update: Cumulus campus sale to AWS

    Talen Energy · Document date: Mar 4, 2024 · Supports

    Source reference: SUS-R01 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d

Original 960 MW development zoning amendment · Talen reported Salem Township approval on May 28, 2024; not proof of every subsequent building, environmental or occupancy approval status

Company reported municipal action · AWS Susquehanna / Cumulus Campus (Project)

Claim AST-REFRESH-SUS-18 · Recorded claim type: Company reported municipal action · Review: Approved · Claim date: Jun 20, 2024

  1. Registration statement on Form S-1

    Talen Energy · Document date: Jun 20, 2024 · Supports

    Source reference: SUS-R14 · Primary

    Source URL

    https://ir.talenenergy.com/static-files/4d511c82-f322-49e5-ae7d-c7c5315d8959

Counterparties and capital

Amazon Web Services · Campus owner and operator · CMP-0152

Talen Energy · Power supplier and former campus owner · CMP-1517

Susquehanna Nuclear LLC · Nuclear generator

PJM Interconnection · Grid operator · CMP-0423

Federal Energy Regulatory Commission · Federal regulator · CMP-0422

PPL Electric Utilities · Transmission and delivery · CMP-1117

Pennsylvania-American Water Company — Berwick System · Primary approved water supply

Gray Development · Current campus construction lead

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.