Scope and capacity
AWS owns the former Cumulus data-center campus beside the Susquehanna nuclear station in Salem Township. The $650 million acquisition was announced in March 2024, and the township describes the development as approximately 1,200 acres. Gray identifies itself as the construction lead for the continuing development, with that work beginning in 2025. Talen’s latest quarterly filing reports an April 2026 contractual transition to the revised PPA; that disclosure does not establish completion of all physical load-conversion work. Its maximum 1,920 MW supply commitment extends through 2042 and can also serve other Pennsylvania sites; it is not the campus’s measured IT load. The original 960 MW development potential is likewise not an operating-capacity figure. The revised arrangement names Talen as retail supplier and PPL for transmission and delivery through the PJM grid. The former behind-the-meter ISA appeal was voluntarily dismissed in January 2026. For PHL100, the river-basin commission approved up to 0.129 million gallons per day of consumptive use on a 30-day average, with Pennsylvania-American Water’s Berwick system as the primary supply. The approval covers evaporative cooling, not a measurement of actual consumption. A separate air-permit application proposes additional emergency generators; their ratings must not be counted as IT capacity. Current operating IT load, parcel-level expansion limits and the final disposition of that generator application remain unverified.
Headline: 1,920 MW Contracted
This record and AWS Salem Township cover development beside the Susquehanna nuclear plant and the Talen supply arrangement. Their supply figures overlap and are not additive.
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (27)
Campus purchase price · $650,000,000
Completed March 2024 campus acquisition; not expansion capex · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-011 · Recorded claim type: Completed March 2024 campus acquisition; not expansion capex · Review: Approved · Claim date: Mar 4, 2024
- Business update: Cumulus campus sale to AWS
Talen Energy · Document date: Mar 4, 2024 · Supports
Source reference: SUS-R01 · Primary
Source URL
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
Original campus capacity · 960 MW
Original March 2024 development potential; not operating IT · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-012 · Recorded claim type: Original March 2024 development potential; not operating IT · Review: Approved · Claim date: Mar 4, 2024
Headline treatment: Not included in reviewed operating IT capacity
- Business update: Cumulus campus sale to AWS
Talen Energy · Document date: Mar 4, 2024 · Supports
Source reference: SUS-R01 · Primary
Source URL
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
Original March 2024 minimum power commitment ramp · 120 MW increments
Historical original contract terms; not reaffirmed for revised PPA · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-013 · Recorded claim type: Historical original contract terms; not reaffirmed for revised PPA · Review: Approved · Claim date: Mar 4, 2024
Headline treatment: Separate claim, not added to the headline
- Business update: Cumulus campus sale to AWS
Talen Energy · Document date: Mar 4, 2024 · Supports
Source reference: SUS-R01 · Primary
Source URL
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
Original March 2024 AWS power cap option · 480 MW
Historical original one time option; not reaffirmed for revised PPA · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-014 · Recorded claim type: Historical original one time option; not reaffirmed for revised PPA · Review: Approved · Claim date: Mar 4, 2024
- Business update: Cumulus campus sale to AWS
Talen Energy · Document date: Mar 4, 2024 · Supports
Source reference: SUS-R01 · Primary
Source URL
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
Expanded broader AWS PPA full quantity, not campus IT or current delivered load · 1,920 MW
Contracted maximum for adjacent campus and potential other Pennsylvania sites · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-015 · Recorded claim type: Contracted maximum for adjacent campus and potential other Pennsylvania sites · Review: Approved · Claim date: Jun 11, 2025
Headline treatment: Selected headline
- Talen Energy expands nuclear energy relationship with Amazon
Talen Energy · Document date: Jun 11, 2025 · Supports
Source reference: SUS-01 · Company primary
Source URL
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
PPA term end · 2042
Contract term · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-016 · Recorded claim type: Contract term · Review: Approved · Claim date: Jun 11, 2025
- Talen Energy expands nuclear energy relationship with Amazon
Talen Energy · Document date: Jun 11, 2025 · Supports
Source reference: SUS-01 · Company primary
Source URL
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
Nuclear station gross capacity · Approximately 2,500 MW
Separate generation nameplate · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-017 · Recorded claim type: Separate generation nameplate · Review: Approved · Claim date: Not stated
Headline treatment: Generation capacity; not IT capacity
- Powering Data
Talen Energy · Document date: Not stated · Supports
Source reference: SUS-02 · Company primary
Source URL
https://www.talenenergy.com/powering-data/
https://www.talenenergy.com/powering-data/
Talen net nuclear interest · Approximately 2,200 MW
Owner share · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-018 · Recorded claim type: Owner share · Review: Approved · Claim date: Not stated
Headline treatment: Generation capacity; not IT capacity
- Powering Data
Talen Energy · Document date: Not stated · Supports
Source reference: SUS-02 · Company primary
Source URL
https://www.talenenergy.com/powering-data/
https://www.talenenergy.com/powering-data/
Delivery structure · Grid delivered with co located and other Pennsylvania operations structure
Revised · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-B4-019 · Recorded claim type: Revised · Review: Approved · Claim date: Jun 11, 2025
- Talen Energy expands nuclear energy relationship with Amazon
Talen Energy · Document date: Jun 11, 2025 · Supports
Source reference: SUS-01 · Company primary
Source URL
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
- Powering Data
Talen Energy · Document date: Not stated · Supports
Source reference: SUS-02 · Company primary
Source URL
https://www.talenenergy.com/powering-data/
https://www.talenenergy.com/powering-data/
Broader AWS contractual PPA transition, not physical conversion completion or IT commissioning · 2026-04 month
Achieved contractual transition in April 2026 · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-01 · Recorded claim type: Achieved contractual transition in April 2026 · Review: Approved · Claim date: Aug 5, 2026
Headline treatment: Separate claim, not added to the headline
- Q2 2026 Form 10-Q
Talen Energy · Document date: Aug 5, 2026 · Supports
Source reference: SUS-R02 · Primary
Source URL
https://ir.talenenergy.com/node/9536/html
https://ir.talenenergy.com/node/9536/html
Broader AWS PPA electricity delivery counterparties · PPL Electric Utilities: transmission and delivery; Talen: retail electric supplier. Arrangement includes the adjacent campus and may serve other Pennsylvania sites. roles
Revised grid delivered supply · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-02 · Recorded claim type: Revised grid delivered supply · Review: Approved · Claim date: Jun 11, 2025
- Talen Energy expands nuclear energy relationship with Amazon
Talen Energy · Document date: Jun 11, 2025 · Supports
Source reference: SUS-01 · Company primary
Source URL
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
- Q2 2026 Form 10-Q
Talen Energy · Document date: Aug 5, 2026 · Supports
Source reference: SUS-R02 · Primary
Source URL
https://ir.talenenergy.com/node/9536/html
https://ir.talenenergy.com/node/9536/html
Broader 1,920 MW AWS PPA full quantity target, not campus IT · 2032
No later than 2032; forecast may accelerate · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-03 · Recorded claim type: No later than 2032; forecast may accelerate · Review: Approved · Claim date: Jun 11, 2025
- Talen Energy expands nuclear energy relationship with Amazon
Talen Energy · Document date: Jun 11, 2025 · Supports
Source reference: SUS-01 · Company primary
Source URL
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon/
Original behind the meter ISA Amendment appeal disposition · Talen voluntarily dismissed this appeal in January 2026. This is not a finding that all campus permits or co location proceedings are closed. status
Reported achieved legal event · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-04 · Recorded claim type: Reported achieved legal event · Review: Approved · Claim date: Not stated
- 2025 annual report to shareholders, including Form 10-K
Talen Energy / SEC · Document date: Not stated · Supports
Source reference: SUS-R03 · Primary
Source URL
https://www.sec.gov/Archives/edgar/data/1622536/000162253626000025/tln-2025annualreporttoshar.htm
https://www.sec.gov/Archives/edgar/data/1622536/000162253626000025/tln-2025annualreporttoshar.htm
Existing Amazon campus and proposed expansion air application address · 1125 Electron Avenue, Berwick, PA 18603 address
Official permit application address · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-05 · Recorded claim type: Official permit application address · Review: Approved · Claim date: Aug 15, 2026
- Plan approval application 40-00158C
Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports
Source reference: SUS-R06 · Primary
Source URL
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
AWS/Talen Cumulus area described in July 2026 municipal testimony · 1,200 acres
Municipal development description, not a parcel or deed survey · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-06 · Recorded claim type: Municipal development description, not a parcel or deed survey · Review: Approved · Claim date: Not stated
- Amy Evans testimony on data centers
Salem Township Manager / Center for Rural Pennsylvania · Document date: Not stated · Supports
Source reference: SUS-R08 · Primary
Source URL
https://www.rural.pa.gov/Resources/PDFs/news/Evans%20Data%20Center%20Testimony%207.29.26.pdf?t=20260722
https://www.rural.pa.gov/Resources/PDFs/news/Evans%20Data%20Center%20Testimony%207.29.26.pdf?t=20260722
AWS development construction lead near Route 11 east of Cumulus Boulevard · Gray Development; construction role, not campus ownership organization
Contractor reported · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-07 · Recorded claim type: Contractor reported · Review: Approved · Claim date: Not stated
- Salem Township Data Center Development
Gray · Document date: Not stated · Supports
Source reference: SUS-R10 · Primary
Source URL
https://www.gray.com/salem-township-data-center-development/
https://www.gray.com/salem-township-data-center-development/
- Official township home page: AWS construction contact
Salem Township · Document date: Not stated · Supports
Source reference: SUS-R11 · Primary
Source URL
https://www.salemtwp.org/
https://www.salemtwp.org/
Gray led AWS expansion construction start, not original Cumulus start · 2025
Contractor reported achieved · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-08 · Recorded claim type: Contractor reported achieved · Review: Approved · Claim date: Not stated
- Salem Township Data Center Development
Gray · Document date: Not stated · Supports
Source reference: SUS-R10 · Primary
Source URL
https://www.gray.com/salem-township-data-center-development/
https://www.gray.com/salem-township-data-center-development/
- Official township home page: AWS construction contact
Salem Township · Document date: Not stated · Supports
Source reference: SUS-R11 · Primary
Source URL
https://www.salemtwp.org/
https://www.salemtwp.org/
PHL100 approved consumptive use ceiling, not actual use or withdrawal · 0.129 MGD (30-day average)
SRBC approval maximum; 30-day average · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-09 · Recorded claim type: SRBC approval maximum; 30-day average · Review: Approved · Claim date: Mar 12, 2026
- PHL100 Data Center Campus: approval docket 20260301
Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports
Source reference: SUS-R04 · Primary
Source URL
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
- Water Application and Approval Viewer: PHL100
Susquehanna River Basin Commission · Document date: Not stated · Supports
Source reference: SUS-R05 · Primary
Source URL
https://www.srbc.gov/waav/Search/Details?approvalID=21373&pendingNumber=2025-159&sourceID=null
https://www.srbc.gov/waav/Search/Details?approvalID=21373&pendingNumber=2025-159&sourceID=null
PHL100 primary approved water supply · Pennsylvania-American Water Company, Berwick System; approved for potable/sanitary and consumptive uses, not a measured delivery volume utility
Approved source arrangement · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-10 · Recorded claim type: Approved source arrangement · Review: Approved · Claim date: Mar 12, 2026
Headline treatment: Separate claim, not added to the headline
- PHL100 Data Center Campus: approval docket 20260301
Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports
Source reference: SUS-R04 · Primary
Source URL
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
PHL100 approved backup water source arrangements · Production Well 1 (temporary backup); Veolia Bloomsburg; Schuylkill County Municipal Authority; Bob Smith’s Clean Water. Permitted purposes differ by source under docket 20260301. sources
Temporary or backup approved arrangements · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-11 · Recorded claim type: Temporary or backup approved arrangements · Review: Approved · Claim date: Mar 12, 2026
- PHL100 Data Center Campus: approval docket 20260301
Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports
Source reference: SUS-R04 · Primary
Source URL
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
PHL100 authorized cooling water use · Evaporative cooling and incidental uses; authorization does not establish actual consumption or the operating configuration of each building system
Authorized use · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-12 · Recorded claim type: Authorized use · Review: Approved · Claim date: Mar 12, 2026
- PHL100 Data Center Campus: approval docket 20260301
Susquehanna River Basin Commission · Document date: Mar 12, 2026 · Supports
Source reference: SUS-R04 · Primary
Source URL
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
https://www.srbc.gov/waav/Search/getdocket?documenttype=Approval&isabre=False&projectnumber=20260301
40-00158 C proposed additional critical emergency generators · 84 × 2,750 KW; installation unverified; backup ratings are not IT capacity equipment
Permit application; installation unverified · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-13 · Recorded claim type: Permit application; installation unverified · Review: Approved · Claim date: Aug 15, 2026
- Plan approval application 40-00158C
Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports
Source reference: SUS-R06 · Primary
Source URL
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
40-00158 C proposed additional auxiliary emergency generators · 2 × 400 KW; installation unverified; backup ratings are not IT capacity equipment
Permit application; installation unverified · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-14 · Recorded claim type: Permit application; installation unverified · Review: Approved · Claim date: Aug 15, 2026
- Plan approval application 40-00158C
Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports
Source reference: SUS-R06 · Primary
Source URL
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
40-00158 C proposed emergency generator fuel · Diesel / hydrotreated vegetable oil for proposed backup equipment; installation and final application disposition unverified fuel
Proposed application limits · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-15 · Recorded claim type: Proposed application limits · Review: Approved · Claim date: Aug 15, 2026
- Plan approval application 40-00158C
Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports
Source reference: SUS-R06 · Primary
Source URL
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
40-00158 C proposed additional bulk fuel storage · 3 × 12,000 US gallons, excluding generator belly tanks; installation and final application disposition unverified equipment
Permit application · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-16 · Recorded claim type: Permit application · Review: Approved · Claim date: Aug 15, 2026
Headline treatment: Generation capacity; not IT capacity
- Plan approval application 40-00158C
Pennsylvania DEP / Pennsylvania Bulletin · Document date: Aug 15, 2026 · Supports
Source reference: SUS-R06 · Primary
Source URL
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-33/1169.html
Original Cumulus historical fiber provision · Redundant fiber network described by the seller in March 2024; current carriers, bandwidth and diverse entry routes unverified network
Seller description, March 2024 · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-17 · Recorded claim type: Seller description, March 2024 · Review: Approved · Claim date: Mar 4, 2024
- Business update: Cumulus campus sale to AWS
Talen Energy · Document date: Mar 4, 2024 · Supports
Source reference: SUS-R01 · Primary
Source URL
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
https://ir.talenenergy.com/static-files/f02c44a9-d2dc-45c1-9331-eee1495f7d2d
Original 960 MW development zoning amendment · Talen reported Salem Township approval on May 28, 2024; not proof of every subsequent building, environmental or occupancy approval status
Company reported municipal action · AWS Susquehanna / Cumulus Campus (Project)
Claim AST-REFRESH-SUS-18 · Recorded claim type: Company reported municipal action · Review: Approved · Claim date: Jun 20, 2024
- Registration statement on Form S-1
Talen Energy · Document date: Jun 20, 2024 · Supports
Source reference: SUS-R14 · Primary
Source URL
https://ir.talenenergy.com/static-files/4d511c82-f322-49e5-ae7d-c7c5315d8959
https://ir.talenenergy.com/static-files/4d511c82-f322-49e5-ae7d-c7c5315d8959
Counterparties and capital
Amazon Web Services · Campus owner and operator · CMP-0152
Talen Energy · Power supplier and former campus owner · CMP-1517
Susquehanna Nuclear LLC · Nuclear generator
PJM Interconnection · Grid operator · CMP-0423
Federal Energy Regulatory Commission · Federal regulator · CMP-0422
PPL Electric Utilities · Transmission and delivery · CMP-1117
Pennsylvania-American Water Company — Berwick System · Primary approved water supply
Gray Development · Current campus construction lead
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.