AWS PDX-154 Boardman Airport Campus

East of Boardman Airport, Oregon, United StatesPreconstruction
Capacity
No public figure
Lead participant
Amazon Data Services, Inc.
Developer
Last updated
Aug 24, 2026
Most recent public record update

About AWS PDX-154 Boardman Airport Campus

PDX-154 is an approved four-building campus planned near Boardman Airport, with land-use conditions addressing water, wastewater and airport impacts. AWS PDX-154 Boardman Airport Campus is in East of Boardman Airport, OR, US and is a data center campus with preconstruction status. Participants include Amazon Web Services, Inc. as owner, Amazon Data Services, Inc. as developer. Development comprises Four-building campus (preconstruction). Key milestones include PDX-154 land-use application approved with conditions. (2026-03-31). water stormwater and wastewater systems: Industrial-water building, eight-acre stormwater pond, two wastewater ponds and septic drain field under land-use conditions. Permitting includes land use application for PDX-154 (approved with conditions).

Program relationships

1 linked

Projects sharing a market, utility, or organization.

2 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Four-building campusAnnounced Or Preconstruction

Approximately 816,000 square feet total.

4 buildings

Mar 31, 2026
PDX-154 land-use application approved with conditions
Completed

Infrastructure

Utility ServiceSecured Or Contracted

Industrial-water building, eight-acre stormwater pond, two wastewater ponds and septic drain field under land-use conditions.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

5 facts
Land Use Approval Date
2026-03-31
Actual
Planned Building Count
4 data center buildings
Actual
Planned Floor Area
816,000 sq. ft.
Reported Rounded
Stormwater Evaporation Pond Area
8 acres
Actual
Wastewater Pond Count
2 ponds
Actual