AWS Warren County Data Center Campus
Preconstruction · Vicksburg / Dana Road, Mississippi, United States
Location note: Central-Mississippi grouping record limited to Canton, Ridgeland and Clinton. Warren County/Vicksburg remains excluded even though it contributes to Amazon's USD25 billion statewide total.
AWS's Madison-Hinds grouping covers two Madison County campuses and a Clinton adaptive-reuse facility. AWS Mississippi Madison-Hinds Program is located in Central-Mississippi grouping record limited to Canton, Ridgeland and Clinton. Warren County/Vicksburg remains excluded even though it contributes to Amazon's USD25 billion statewide total., MS, US and is a data center program in partially operational status. Participants include Amazon Web Services, Inc. as operator, Amazon.com, Inc. as owner, Entergy Mississippi as utility. Development comprises Original Madison County program (construction), Additional Madison County expansion (construction). Key milestones include Original USD10 billion Madison program breaks ground (2024-05-20) and Amazon announces additional Madison and Hinds investments (2026-04-09). planned solar addition — 650 MW generation: Utility generation planned for the original program; not data center capacity. grid improvements — 300 USD million: Amazon-announced Mississippi grid improvements with incremental costs assigned to Amazon. Incentives include Project Atlas statutory data center tax framework (enacted) for State tax exemptions, fee-in-lieu and infrastructure authorities for the original AWS project; allocation to individual campuses is not disclosed. and state incentive package (approved) for USD44 million package reported for the original Project Atlas program.
Projects sharing a market, utility, or organization.
Preconstruction · Vicksburg / Dana Road, Mississippi, United States
No additional capacity claims are published.
USD10 billion across Canton and Ridgeland; not allocated between sites.
Additional USD11 billion across Madison County operations; site/phase allocation undisclosed.
650 MW generation
Utility generation planned for the original program; not data center capacity.
$300 million
Amazon-announced Mississippi grid improvements with incremental costs assigned to Amazon.
No map point available
Published claims and their source links.