AtlasEdge LEV002 Leverkusen Data Center

Leverkusen, North Rhine-Westphalia, GermanyUnder construction
Evidence
Planned critical IT
4.4 MW
Updated
Oct 28, 2026

LEV002 is AtlasEdge’s 4.4 MW AI-ready expansion beside LEV001. City reporting confirms a February 2026 construction start, roughly 3,400 square metres of technical space and a Q2 2027 delivery target; all are development claims rather than operating capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

4.4 MW

Source

Reported capacity

Planned / design or future potential

4.4 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryAnnounced or preconstruction

LEV002 is AtlasEdge’s 4.4 MW AI-ready expansion beside LEV001. City reporting confirms a February 2026 construction start, roughly 3,400 square metres of technical space and a Q2 2027 delivery target; all are development claims rather than operating capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Milestones (2)
Construction commenced

Feb 2026 · Recorded actual event

Completed · Construction started

Source not linked
Ready-for-service target

Q2 2027 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

LEV002 | Leverkusen | North Rhine-Westphalia | DE

Source

Location context

Actual

LEV002 | Leverkusen | North Rhine-Westphalia | DE

Source

Technical area

Design

3,400 square metres

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

AtlasEdge publishes 4.4 MW of IT capacity for LEV002.

Source

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

4.4 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

4.4 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Current lifecycle

Actual

Under development

Source

Operating model

Actual

Carrier neutral colocation

Source

Target ready for service

Forecast

Q2 2027

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

4.4 MW

Published IT design boundary; utility service and operating load remain distinct.

Fiber

Planned or represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
AtlasEdge LEV001 Leverkusen Data Center

Operating · Leverkusen, North Rhine-Westphalia, Germany

Same locality: Leverkusen · Shared participant: AtlasEdge

Compare in a collection
AtlasEdge DUS001 Düsseldorf Data Center

Operating · Düsseldorf, North Rhine-Westphalia, Germany

Shared participant: AtlasEdge · Same market: North Rhine-Westphalia, Germany

Compare in a collection