AtlasEdge LEV001 Leverkusen Data Center

Leverkusen, North Rhine-Westphalia, GermanyOperating
Evidence
Planned critical IT
1.6 MW
Updated
Oct 28, 2026

LEV001 is the existing operating Leverkusen facility beside the new LEV002 build. City reporting independently confirms the live identity and near-full utilization context; the 1.6 MW headline remains the facility’s published IT boundary, not the combined site. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

1.6 MW

Source

Reported capacity

Design

1.6 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

LEV001 is the existing operating Leverkusen facility beside the new LEV002 build. City reporting independently confirms the live identity and near-full utilization context; the 1.6 MW headline remains the facility’s published IT boundary, not the combined site. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

LEV001 | Leverkusen | North Rhine-Westphalia | DE

Source

Location context

Actual

LEV001 | Leverkusen | North Rhine-Westphalia | DE

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

AtlasEdge publishes 1.6 MW of IT capacity for LEV001.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

1.6 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

1.6 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Current lifecycle

Actual

Operating

Source

Operating model

Actual

Carrier neutral colocation

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

1.6 MW

Facility IT boundary; customer utilization is not disclosed.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
AtlasEdge LEV002 Leverkusen Data Center

Under construction · Leverkusen, North Rhine-Westphalia, Germany

Same locality: Leverkusen · Shared participant: AtlasEdge

Compare in a collection
AtlasEdge DUS001 Düsseldorf Data Center

Operating · Düsseldorf, North Rhine-Westphalia, Germany

Shared participant: AtlasEdge · Same market: North Rhine-Westphalia, Germany

Compare in a collection