About AtlasEdge DUS001 Düsseldorf Data Center

DUS001 is an operating carrier-neutral facility in Hilden serving the Düsseldorf market. Current public descriptions conflict between the stored 11.2 MW IT figure, a 10 MW external facility record and a 20 MW operator total-power statement, so

Projects sharing a market, utility, or organization.

2 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

DUS001 is an operating carrier-neutral facility in Hilden serving the Düsseldorf market. Current public descriptions conflict between the stored 11.2 MW IT figure, a 10 MW external facility record and a 20 MW operator total-power statement, so the available public sources do not establish a single project-scoped capacity figure.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

11.2 MW

Facility IT boundary; customer utilization is not disclosed.

FiberOperational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
DUS001 | Düsseldorf | North Rhine-Westphalia | DE
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
AtlasEdge publishes 11.2 MW of IT capacity for DUS001.
Actual
Location Context
DUS001 | Düsseldorf | North Rhine-Westphalia | DE
Actual
Lifecycle Status
Operating
Actual
Operator Confirmed
AtlasEdge
Actual
Facility Capacity Basis
The stored 11.2 MW IT figure conflicts with current third party 10 MW and operator 20 MW total power descriptions; headline withheld pending a current facility IT statement.
Actual
Current Lifecycle
Operating
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
Operating Model
Carrier neutral colocation
Actual
Renewable Energy Claim
100 percent
Actual