Operating / Stabilized · Tahoe Reno Industrial Center, Nevada, United States
- Capacity
- 850 MW
- Planned / design
- Verified
- Aug 25, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Switch Tahoe Reno Citadel Campus | Switch Las Vegas Core Campus |
|---|---|---|
| Record type | Site | Site |
| Status | Operating / Stabilized | Partially operational |
| Location | Tahoe Reno Industrial Center, Nevada, United States | Las Vegas, Nevada, United States |
| Headline capacity | 850 MW · Planned / design | 495 MW · Planned critical IT |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Capital Dynamics | Switch |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 25, 2026 | Aug 28, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Operating / Stabilized · Tahoe Reno Industrial Center, Nevada, United States
Partially operational · Las Vegas, Nevada, United States
Save public profiles to a device watchlist, then create a separate view-only link.