Preconstruction · Abilene, Texas, United States
- Capacity
- 900 MW
- Planned / design
- Verified
- Aug 18, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Crusoe–Microsoft Abilene | Stargate Abilene |
|---|---|---|
| Record type | Site | Site |
| Status | Preconstruction | Operating / Stabilized |
| Location | Abilene, Texas, United States | Abilene, Texas, United States |
| Headline capacity | 900 MW · Planned / design | 1,200 MW · Planned / design |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Crusoe | Crusoe |
| Utility | Under verification | Under verification |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 18, 2026 | Aug 18, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Preconstruction · Abilene, Texas, United States
Operating / Stabilized · Abilene, Texas, United States
Save public profiles to a device watchlist, then create a separate view-only link.