Under construction · Kamloops, British Columbia, Canada
- Capacity
- 26 MW
- Planned / design
- Verified
- Aug 25, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Bell AI Fabric TRU Data Centre | Bell AI Fabric Mission Flats |
|---|---|---|
| Record type | Site | Site |
| Status | Under construction | Operating / Stabilized |
| Location | Kamloops, British Columbia, Canada | Kamloops, British Columbia, Canada |
| Headline capacity | 26 MW · Planned / design | 7 MW · Planned / design |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | TrueNorth Sustainable Infrastructure | Bell Canada |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 25, 2026 | Aug 25, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Under construction · Kamloops, British Columbia, Canada
Operating / Stabilized · Kamloops, British Columbia, Canada
Save public profiles to a device watchlist, then create a separate view-only link.