Bell AI Fabric Mission Flats
- Planned / design
- 7 MW
- Updated
- Oct 28, 2026
Bell AI Fabric Mission Flats is the first identifiable 7 MW Kamloops facility, associated with Groq inference infrastructure. It is separate from the later TRU and unnamed Kamloops developments.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
First 7 MW Groq-powered Kamloops node.
Milestones (2)
Jun 2025 · Event timing type not established
Status not stated · Event type not stated
Source not linkedQ1 2026 · Recorded actual event
Completed · Event type not stated
Source not linkedParticipants
Operator
Sources by role
Operator (1)
- BCE Q1 2026 financial reports and transcript · May 7, 2026 · Corroborating
Operator (1)
- Bell Canada Increases Sovereign AI Capacity with Bell AI Fabric · May 28, 2025 · Primary
Additional project facts
Infrastructure & permits
Technical details (2)
Operational
7 MW facility capacity
Bell/Groq 7 MW inference node; capacity definition not further specified.
Operational
Integrated into Bell's national network; route and carrier detail not disclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Under construction · Kamloops, British Columbia, Canada
Same locality: Kamloops
Compare in a collection