Cartis diligence evidence schedule
Vantage JHB1 Johor Data Center Campus
PRJ-0843 · Site · Sedenak, Johor, Malaysia
Captured 2026-09-06T04:13:19.836Z · Record last updated 2026-08-28
SHA-256: 8072554d3477749495a4f1909aaa1207c1f80a58147065d804def602d3825d0f
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Vantage JHB1 Johor Data Center Campus, also known as Vantage JHB1 Johor, is a data center project in Sedenak, Johor, MY associated with Vantage Data Centers. 73-acre Sedenak Tech Park campus; three data centers; more than 930,000 square feet; 300 MW critical IT load at full build. Dual 275 kV feeds, diverse 33 kV building feeds, liquid-cooling readiness and multiple diverse fiber pathways. More than 300 MW is the planned three-building full-campus IT envelope after Vantage’s acquisition of the former Yondr development; it is not current operating capacity.
Headline: 300 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Location Context · Vantage JHB1 Johor | Sedenak | Johor | MY
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 62594 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Lifecycle Status · Partially operational
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 62595 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Reported Capacity · 300 MW
design · Vantage JHB1 Johor Data Center Campus (project)
Claim 62596 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Capacity Basis · Vantage Data Centers publishes 300 MW of critical IT capacity for this record boundary.
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 62597 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Location Context · Vantage JHB1 Johor | Sedenak | Johor | MY
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 97273 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Lifecycle Status · Partially operational
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 97274 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Reported Capacity · 300 MW
Planned / design or future potential · Vantage JHB1 Johor Data Center Campus (project)
Claim 97275 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Capacity Basis · More than 300 MW is the planned three building full campus IT envelope after Vantage’s acquisition of the former Yondr development; it is not current operating capacity.
Planned / design or future potential · Vantage JHB1 Johor Data Center Campus (project)
Claim 97276 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Site Area · 73 acres
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 97277 · Review: Approved · Claim date: Not published
- Vantage Data Centers Vantage JHB1 Johor profile
Vantage Data Centers · Document date: 2026-08-28 · Primary
https://vantage-dc.com/data-center-locations/apac/johor-malaysia
Building Count · 3 data centers
design · Vantage JHB1 Johor Data Center Campus (project)
Claim 97278 · Review: Approved · Claim date: Not published
- Vantage completes APAC investment and JHB1 acquisition
Vantage Data Centers · Document date: 2025-11-23 · Primary
https://vantage-dc.com/news/vantage-data-centers-completes-1-6b-investment-in-apac-platform-from-gic-and-adia-closes-acquisition-of-yondrs-300mw-hyperscale-campus-in-johor-malaysia/
Full Build It Capacity · 300+ MW
forecast · Vantage JHB1 Johor Data Center Campus (project)
Claim 97279 · Review: Approved · Claim date: Not published
- Vantage completes APAC investment and JHB1 acquisition
Vantage Data Centers · Document date: 2025-11-23 · Primary
https://vantage-dc.com/news/vantage-data-centers-completes-1-6b-investment-in-apac-platform-from-gic-and-adia-closes-acquisition-of-yondrs-300mw-hyperscale-campus-in-johor-malaysia/
Platform Equity Investment · $1,600,000,000
transaction scope · Vantage JHB1 Johor Data Center Campus (project)
Claim 97280 · Review: Approved · Claim date: Not published
- Vantage completes APAC investment and JHB1 acquisition
Vantage Data Centers · Document date: 2025-11-23 · Primary
https://vantage-dc.com/news/vantage-data-centers-completes-1-6b-investment-in-apac-platform-from-gic-and-adia-closes-acquisition-of-yondrs-300mw-hyperscale-campus-in-johor-malaysia/
Prior Financing · Green loan
actual · Vantage JHB1 Johor Data Center Campus (project)
Claim 97281 · Review: Approved · Claim date: Not published
- Vantage completes APAC investment and JHB1 acquisition
Vantage Data Centers · Document date: 2025-11-23 · Primary
https://vantage-dc.com/news/vantage-data-centers-completes-1-6b-investment-in-apac-platform-from-gic-and-adia-closes-acquisition-of-yondrs-300mw-hyperscale-campus-in-johor-malaysia/
Counterparties and capital
Abu Dhabi Investment Authority · Investor · CMP-1605
GIC · Investor · CMP-1265
Vantage Data Centers · Developer · CMP-0109
Yondr Group · Developer · CMP-1426
$1,600,000,000 · 2025-11-23
Platform-level GIC/ADIA investment partly used to acquire JHB1; not wholly attributable construction cost.
Vantage Data Centers (Borrower)
Financing record 191; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.