Scope and capacity
Stargate UAE is a planned 1 GW AI-compute cluster in Abu Dhabi, distinct from the announced 5 GW UAE–U.S. AI Campus that hosts it. G42 and Khazna are delivering the physical infrastructure for the OpenAI–Oracle operating partnership. The initial 200 MW facility remains the focus of published construction reporting. G42’s October 2025 update forecast delivery in 2026; ALEC’s August 2026 project table separately reported 52% contractor completion as of June and an expected contract-completion year of 2027. These are different milestones, not evidence of a confirmed operator go-live revision. ALEC describes a 200 MW electrical design, 200 MW of heat rejection and liquid/immersion cooling approaches. These design figures do not establish commissioned IT load. Its reported AED 5.2 billion first-phase contract is not the cost or financing of the full cluster. TAQA is developing a broader Stargate electricity and water scheme, but its capacity cannot be allocated to this cluster from the published report. Cisco’s announced role covers connectivity and security; installed carrier routes and resilience ratings remain undisclosed. Entity-level US advanced-computing authorizations progressed in July 2026, without proving chip delivery or local permit completion. Precise cluster parcels, project-specific financing, actual water demand and verified commissioning remain unresolved in the reviewed public evidence.
Headline: 1,000 MW Planned / design
The planned 1 GW Stargate cluster is within the 5 GW host-campus envelope. The host envelope and cluster capacity overlap and are not additive.
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (24)
Planned Stargate cluster capacity · 1 GW
Planned / design or future potential · Stargate UAE (Project)
Claim AST-B2-012 · Recorded claim type: Announced cluster capacity; electrical basis not disclosed · Review: Approved · Claim date: May 22, 2025
Headline treatment: Selected headline
- Introducing Stargate UAE
OpenAI · Document date: May 22, 2025 · Supports
Source reference: UAE-01 · Company primary
Source URL
https://openai.com/index/introducing-stargate-uae/
https://openai.com/index/introducing-stargate-uae/
Initial phase capacity · 200 MW
Planned / design or future potential · Stargate UAE (Project)
Claim AST-B2-013 · Recorded claim type: Planned first phase · Review: Approved · Claim date: May 22, 2025
Headline treatment: Separate claim, not added to the headline
- Introducing Stargate UAE
OpenAI · Document date: May 22, 2025 · Supports
Source reference: UAE-01 · Company primary
Source URL
https://openai.com/index/introducing-stargate-uae/
https://openai.com/index/introducing-stargate-uae/
Initial 200 MW developer delivery forecast · 2026
G42 October 2025 forecast; distinct from ALEC contract completion · Stargate UAE (Project)
Claim AST-B2-014 · Recorded claim type: G42 October 2025 forecast; distinct from ALEC contract completion · Review: Approved · Claim date: Oct 16, 2025
- Construction update on Stargate UAE AI infrastructure cluster
G42 · Document date: Oct 16, 2025 · Supports
Source reference: UAE-03 · Developer primary republication
Source URL
https://www.prnewswire.com/in/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html
https://www.prnewswire.com/in/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html
Host campus capacity · 5 GW
Planned / design or future potential · Stargate UAE (Project)
Claim AST-B2-015 · Recorded claim type: Separate multi tenant context · Review: Approved · Claim date: May 22, 2025
Headline treatment: Separate or overlapping physical boundary
- Global Tech Alliance Launches Stargate UAE
G42 · Document date: May 22, 2025 · Supports
Source reference: UAE-02 · Developer primary
Source URL
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
Host campus area · 10 square miles
Reported · Stargate UAE (Project)
Claim AST-B2-016 · Recorded claim type: Reported · Review: Approved · Claim date: May 22, 2025
- Global Tech Alliance Launches Stargate UAE
G42 · Document date: May 22, 2025 · Supports
Source reference: UAE-02 · Developer primary
Source URL
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
Accelerator platform · NVIDIA Grace Blackwell GB300 system
Planned · Stargate UAE (Project)
Claim AST-B2-017 · Recorded claim type: Planned · Review: Approved · Claim date: May 22, 2025
- Global Tech Alliance Launches Stargate UAE
G42 · Document date: May 22, 2025 · Supports
Source reference: UAE-02 · Developer primary
Source URL
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
Power sources · Nuclear solar and natural gas mix
Planned host campus · Stargate UAE (Project)
Claim AST-B2-018 · Recorded claim type: Planned host campus · Review: Approved · Claim date: May 22, 2025
- Global Tech Alliance Launches Stargate UAE
G42 · Document date: May 22, 2025 · Supports
Source reference: UAE-02 · Developer primary
Source URL
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae
Geographic service radius · 2,000 miles
Company estimate · Stargate UAE (Project)
Claim AST-B2-019 · Recorded claim type: Company estimate · Review: Approved with followup · Claim date: May 22, 2025
- Introducing Stargate UAE
OpenAI · Document date: May 22, 2025 · Supports
Source reference: UAE-01 · Company primary
Source URL
https://openai.com/index/introducing-stargate-uae/
https://openai.com/index/introducing-stargate-uae/
Construction status · Well underway status
Company reported · Stargate UAE (Project)
Claim AST-B2-020 · Recorded claim type: Company reported · Review: Approved · Claim date: Oct 16, 2025
- Construction update on Stargate UAE AI infrastructure cluster
G42 · Document date: Oct 16, 2025 · Supports
Source reference: UAE-03 · Developer primary republication
Source URL
https://www.prnewswire.com/in/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html
https://www.prnewswire.com/in/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html
ALEC initial 200 MW contract progress as of June 2026 · 52 percent
Contractor completion percentage; not commissioned IT · Stargate UAE (Project)
Claim AST-REFRESH-UAE-01 · Recorded claim type: Contractor completion percentage; not commissioned IT · Review: Approved · Claim date: Aug 2026
Headline treatment: Separate claim, not added to the headline
- H1 and Q2 2026 earnings presentation
ALEC Holdings · Document date: Aug 2026 · Supports
Source reference: UAE-R02 · Primary
Source URL
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
ALEC initial 200 MW contract expected completion, not operator go live · 2027
Contractor forecast reported in August 2026; not a confirmed operator revision · Stargate UAE (Project)
Claim AST-REFRESH-UAE-02 · Recorded claim type: Contractor forecast reported in August 2026; not a confirmed operator revision · Review: Approved · Claim date: Aug 2026
Headline treatment: Separate claim, not added to the headline
- H1 and Q2 2026 earnings presentation
ALEC Holdings · Document date: Aug 2026 · Supports
Source reference: UAE-R02 · Primary
Source URL
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
ALEC initial 200 MW contract remaining backlog as of June 2026 · 2,882 AED million
Contractor backlog; not project debt or total cluster cost · Stargate UAE (Project)
Claim AST-REFRESH-UAE-03 · Recorded claim type: Contractor backlog; not project debt or total cluster cost · Review: Approved · Claim date: Aug 2026
- H1 and Q2 2026 earnings presentation
ALEC Holdings · Document date: Aug 2026 · Supports
Source reference: UAE-R02 · Primary
Source URL
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
https://ir.alec.ae/media/qbwjrlao/alec-holdings_august-2026-presentation_vf-1.pdf
ALEC initial 200 MW construction contract value · 5.2 AED billion
Contract value; not full cluster capex or project financing · Stargate UAE (Project)
Claim AST-REFRESH-UAE-04 · Recorded claim type: Contract value; not full cluster capex or project financing · Review: Approved · Claim date: Not stated
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Initial 200 MW facility electrical design capacity, not operating IT · 200 MW electrical
Planned / design or future potential · Stargate UAE (Project)
Claim AST-REFRESH-UAE-05 · Recorded claim type: ALEC design rating; energized load unverified · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Initial facility thermal heat rejection design, not electrical or IT load · 200 MW thermal
Planned / design or future potential · Stargate UAE (Project)
Claim AST-REFRESH-UAE-06 · Recorded claim type: ALEC design heat dissipation rating; installation unverified · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Initial 200 MW facility built up design area, not land area · 250,000 square metres
Planned / design or future potential · Stargate UAE (Project)
Claim AST-REFRESH-UAE-07 · Recorded claim type: ALEC contractor design area · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Initial 200 MW facility cooling design · ALEC describes liquid and immersion cooling approaches; commissioned configuration and operational deployment unverified system
Planned / design or future potential · Stargate UAE (Project)
Claim AST-REFRESH-UAE-08 · Recorded claim type: Contractor description · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Initial 200 MW facility construction participants for client Khazna · ALEC Construction: structure; ALEC Data Center Solutions: design/modular delivery; ALEMCO: MEP and cooling; LINQ: prefabrication; ALEC Technologies: ELV systems organizations
Structural, design/modular, MEP, prefabrication and ELV roles · Stargate UAE (Project)
Claim AST-REFRESH-UAE-09 · Recorded claim type: Structural, design/modular, MEP, prefabrication and ELV roles · Review: Approved · Claim date: Not stated
- Integrated Annual Report 2025
ALEC Holdings · Document date: Not stated · Supports
Source reference: UAE-R01 · Primary
Source URL
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
https://ir.alec.ae/media/v2jpiqjp/alec-holdings-integrated-annual-report-2025-english.pdf
Broader TAQA Stargate utility service design demand; cluster allocation unknown · 2 GW
Broader utility scheme in development; not cluster load or proof of energization · Stargate UAE (Project)
Claim AST-REFRESH-UAE-10 · Recorded claim type: Broader utility scheme in development; not cluster load or proof of energization · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- TAQA Integrated Report 2025
TAQA / Abu Dhabi Securities Exchange · Document date: Not stated · Supports
Source reference: UAE-R04 · Primary
Source URL
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
Broader TAQA Stargate utility transmission scheme · 14 Substations and over 400 km of cables/overhead lines in development; not confirmed completed cluster assets, and cluster allocation is unknown scheme
In development · Stargate UAE (Project)
Claim AST-REFRESH-UAE-11 · Recorded claim type: In development · Review: Approved · Claim date: Not stated
- TAQA Integrated Report 2025
TAQA / Abu Dhabi Securities Exchange · Document date: Not stated · Supports
Source reference: UAE-R04 · Primary
Source URL
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
Broader TAQA Stargate utility water scheme · 47 MIGD pumping station, two water tanks and 40 km pipeline in development; infrastructure ratings are not consumption or an allocation to the 1 GW cluster or initial 200 MW phase scheme
In development · Stargate UAE (Project)
Claim AST-REFRESH-UAE-12 · Recorded claim type: In development · Review: Approved · Claim date: Not stated
- TAQA Integrated Report 2025
TAQA / Abu Dhabi Securities Exchange · Document date: Not stated · Supports
Source reference: UAE-R04 · Primary
Source URL
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
https://apigateway.adx.ae/adx/cdn/1.0/content/download/4759635
Khazna corporate platform ownership, not project company equity · G42 majority; MGX and Silver Lake minority; e& exited. Stargate project-SPV equity and fee ownership are not established by this corporate transaction. ownership
Platform level transaction · Stargate UAE (Project)
Claim AST-REFRESH-UAE-13 · Recorded claim type: Platform level transaction · Review: Approved · Claim date: Mar 26, 2025
- Khazna welcomes MGX and Silver Lake as strategic minority investors
Khazna Data Centers · Document date: Mar 26, 2025 · Supports
Source reference: UAE-R05 · Primary
Source URL
https://khaznadatacenters.com/press-release/khazna-welcomes-mgx-and-silver-lake-as-strategic-minority-investors/
https://khaznadatacenters.com/press-release/khazna-welcomes-mgx-and-silver-lake-as-strategic-minority-investors/
G42/Core42 entity level advanced computing regulatory context · Authorized recipients under specified BIS conditions effective July 10, 2026; not proof of Stargate chip delivery, local permits or commissioning authorization
Entity level export control rule · Stargate UAE (Project)
Claim AST-REFRESH-UAE-14 · Recorded claim type: Entity level export control rule · Review: Approved · Claim date: Jul 14, 2026
- UAE country-group and authorized-recipient rule
US Bureau of Industry and Security / Federal Register · Document date: Jul 14, 2026 · Supports
Source reference: UAE-R07 · Primary
Source URL
https://www.govinfo.gov/content/pkg/FR-2026-07-14/pdf/2026-14132.pdf
https://www.govinfo.gov/content/pkg/FR-2026-07-14/pdf/2026-14132.pdf
- G42 welcomes a new milestone in the US–UAE AI partnership
G42 · Document date: Jul 17, 2026 · Supports
Source reference: UAE-R08 · Primary
Source URL
https://www.g42.ai/resources/news/g42-welcomes-new-milestone-us-uae-ai-partnership
https://www.g42.ai/resources/news/g42-welcomes-new-milestone-us-uae-ai-partnership
G42/Core42 recipient authorization expiry absent subsequent BIS notice · Apr 6, 2027
Conditional entity level export authorization expiry; not a construction milestone · Stargate UAE (Project)
Claim AST-REFRESH-UAE-15 · Recorded claim type: Conditional entity level export authorization expiry; not a construction milestone · Review: Approved · Claim date: Jul 14, 2026
- UAE country-group and authorized-recipient rule
US Bureau of Industry and Security / Federal Register · Document date: Jul 14, 2026 · Supports
Source reference: UAE-R07 · Primary
Source URL
https://www.govinfo.gov/content/pkg/FR-2026-07-14/pdf/2026-14132.pdf
https://www.govinfo.gov/content/pkg/FR-2026-07-14/pdf/2026-14132.pdf
Counterparties and capital
G42 · Project sponsor · CMP-0138
Khazna Data Centers · Physical developer · CMP-0137
OpenAI · Operator and compute platform · CMP-0007
Oracle · Operator and cloud infrastructure · CMP-0006
NVIDIA · Accelerator supplier · CMP-0010
Cisco · Network and security supplier
SoftBank Group · Strategic partner
ALEC Holdings / ALEC Construction · Initial 200 MW construction contractor
ALEMCO · Initial phase MEP and cooling
LINQ · Initial phase modular prefabrication
TAQA Transmission · Broader Stargate utility scheme developer; cluster allocation unverified
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.