Skip to content
All records
Data center siteSite record

STACK SVY02 Santa Clara Data Center Campus

Santa Clara, California, United StatesPartially operational
Capacity
48 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK SVY02 Santa Clara Data Center Campus

STACK SVY02 Santa Clara Data Center Campus, also known as STACK SVY02, is a data center project in Santa Clara, CA, US developed and operated by STACK Infrastructure. Nine-acre, single-building Silicon Valley campus with 48 MW of flexible critical capacity and 560,440 square feet. Dedicated onsite substation and contracted utility capacity in the supply-constrained Santa Clara market.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load48 MWDesign · STACK SVY02 Santa Clara Data Center Campus
Design48 MWDesign · STACK SVY02 Santa Clara Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

48 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for STACK SVY02
Completed

Infrastructure

Electric GridEnergized

Dedicated onsite substation and contracted utility capacity in the supply-constrained Santa Clara market.

FiberEnergized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric GridSecured Or Contracted

12 MW

Silicon Valley Power committed initial capacity; only 6 MW is planned for the first deployment on commitment.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

10 facts
Location Context
STACK SVY02 | Santa Clara | CA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
48 MW
Design
Capacity Basis
STACK Infrastructure publishes 48 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK SVY02 | Santa Clara | CA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
48 MW
Design
Capacity Basis
48 MW facility or campus design capacity.
Actual
Site Area
9 acres
Actual
Building Area
560,440 square feet
Design