STACK SVY02 Santa Clara Data Center Campus

Santa Clara, California, United StatesPartially operational
Evidence
Planned critical IT
48 MW
Updated
Oct 28, 2026

STACK SVY02 Santa Clara Data Center Campus, also known as STACK SVY02, is a data center project in Santa Clara, CA, US developed and operated by STACK Infrastructure. Nine-acre, single-building Silicon Valley campus with 48 MW of flexible critical capacity and 560,440 square feet. Dedicated onsite substation and contracted utility capacity in the supply-constrained Santa Clara market.

Capacity

Reported capacity

Design

48 MW

Source

Reported capacity

Planned / design or future potential

48 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

48 MW is the operator-published facility or campus design boundary.

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

STACK SVY02 | Santa Clara | CA | US

Source

Location context

Actual

STACK SVY02 | Santa Clara | CA | US

Source

Site area

Actual

9 acres

Source

Building area

Design

560,440 square feet

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

STACK Infrastructure publishes 48 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

48 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Dedicated onsite substation and contracted utility capacity in the supply-constrained Santa Clara market.

Fiber

Energized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Electric grid

Secured or contracted

12 MW

Silicon Valley Power committed initial capacity; only 6 MW is planned for the first deployment on commitment.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CoreSite SV3 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection
CoreSite SV4 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection
CoreSite SV5 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection
CoreSite SV9 Santa Clara Data Center

Operating · Santa Clara, California, United States

Same locality: Santa Clara

Compare in a collection