Prime Phoenix Campus PHX01
Under construction · Avondale, Arizona, United States
STACK is advancing PHX01 in Avondale as a 225 MW critical-capacity campus for cloud and AI deployments. STACK Infrastructure is publicly identified in the project record for Avondale, Maricopa County, AZ, US. The disclosed development record includes 100-acre campus; 225 MW planned critical capacity; scalable power and advanced infrastructure in the Phoenix West Valley. Power and infrastructure include large low-latency Southwest campus plan with utility and renewable-energy options. STACK currently identifies PHX01 as a 225 MW critical-capacity campus.
Projects sharing a market, utility, or organization.
Under construction · Avondale, Arizona, United States
Preconstruction · Phoenix, Arizona, United States
Project-wide phase for STACK PHX01 Avondale Data Center Campus; capacity remains classified as design.
225 MW
STACK currently identifies PHX01 as a 225 MW critical-capacity campus.
Large low-latency Southwest campus plan with utility and renewable-energy options.