STACK PHX01 Avondale Data Center Campus

Avondale, Arizona, United StatesPreconstruction
Evidence
Planned / design
225 MW
Updated
Oct 28, 2026

STACK is advancing PHX01 in Avondale as a 225 MW critical-capacity campus for cloud and AI deployments. STACK Infrastructure is publicly identified in the project record for Avondale, Maricopa County, AZ, US. The disclosed development record includes 100-acre campus; 225 MW planned critical capacity; scalable power and advanced infrastructure in the Phoenix West Valley. Power and infrastructure include large low-latency Southwest campus plan with utility and renewable-energy options. STACK currently identifies PHX01 as a 225 MW critical-capacity campus.

Capacity

Reported capacity

Planned / design or future potential

225 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for STACK PHX01 Avondale Data Center Campus; capacity remains classified as design.

Milestones (2)
STACK Phoenix PHX01 project status and capacity disclosed

Mar 14, 2023 · Recorded actual event

Completed · Announced

Source not linked
Master-planned hyperscale campus opportunity

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

PHX01 campus | Avondale/Goodyear Tech Metroplex | Arizona

Source

Development scale

Actual

100-Acre campus

Source

Development milestone

Actual

225 MW planned critical capacity

Source

Technical specifications

Power arrangement

Actual

Scalable power and advanced infrastructure in the Phoenix West Valley.

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

STACK currently identifies PHX01 as a 225 MW critical capacity campus.

Source

Boundary context

Actual

PHX01 campus | Avondale/Goodyear Tech Metroplex | Arizona

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

225 MW

STACK currently identifies PHX01 as a 225 MW critical-capacity campus.

Site facility

Planned or represented

Large low-latency Southwest campus plan with utility and renewable-energy options.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Prime Phoenix Campus PHX01

Under construction · Avondale, Arizona, United States

Same locality: Avondale

Compare in a collection
STACK PHX02 Central Phoenix Data Center Campus

Preconstruction · Phoenix, Arizona, United States

Shared participant: STACK Infrastructure · Same market: Arizona, United States

Compare in a collection