STACK Loudoun County Arcola Data Center Campus
Preconstruction · Ashburn, Virginia, United States
STACK's NVA04 campus is an 80-acre Ashburn development planned for three buildings and 216 MW of critical capacity. STACK Infrastructure is publicly identified in the project record for Ashburn, Loudoun County, VA, US. The disclosed development record includes 216 MW planned critical capacity; 80-acre campus; three buildings totaling nearly 1 million square feet. Power and infrastructure include renewable-power-backed hyperscale campus with access to major long-haul and dark-fiber networks. STACK identifies NVA04 as a 216 MW critical-capacity campus.
Projects sharing a market, utility, or organization.
Preconstruction · Ashburn, Virginia, United States
Operating / Stabilized · Ashburn, Virginia, United States
Operating / Stabilized · Ashburn, Virginia, United States
Operating / Stabilized · Ashburn, Virginia, United States
Project-wide phase for STACK NVA04 Ashburn Data Center Campus; capacity remains classified as design.
216 MW
STACK identifies NVA04 as a 216 MW critical-capacity campus.
Renewable-power-backed hyperscale campus with access to major long-haul and dark-fiber networks.