STACK Loudoun County Arcola Data Center Campus

Ashburn, Virginia, United StatesPreconstruction
Evidence
Planned critical IT
144 MW
Updated
Oct 28, 2026

STACK Loudoun County Arcola Data Center Campus, also known as STACK Loudoun County 144MW Campus, is a data center project in Ashburn, VA, US developed and operated by STACK Infrastructure. Greater Ashburn campus planned as two 72 MW, two-story data center buildings totaling 144 MW. Closed-loop water cooling and flexible deployment models designed for AI, machine-learning and cloud workloads. STACK now markets the same Arcola/Loudoun campus at 200 MW across two two-story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.

Capacity

Reported capacity

Design

144 MW

Source

Reported capacity

Planned / design or future potential

200 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryAnnounced or preconstruction

STACK now markets the same Arcola/Loudoun campus at 200 MW across two two-story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.

Milestones (2)
STACK announced 144 MW Loudoun campus

Feb 11, 2025 · Recorded actual event

Completed · Announced

Source not linked
Current project page reports 200 MW Arcola plan

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

STACK Infrastructure

Developer

Sources by role

Site & development

Location context

Actual

STACK Loudoun County 144MW Campus | Ashburn | VA | US

Source

Location context

Actual

STACK Loudoun County 144MW Campus | Ashburn | VA | US

Source

Site area

Design

122 acres

Source

Building count

Design

2 facilities

Source

Building form

Design

Two story

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

STACK Infrastructure publishes 144 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

STACK now markets the same Arcola/Loudoun campus at 200 MW across two two story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

Closed-loop water cooling and flexible deployment models designed for AI, machine-learning and cloud workloads.

Fiber

Planned or represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
STACK NVA04 Ashburn Data Center Campus

Under construction · Ashburn, Virginia, United States

Same locality: Ashburn · Shared participant: STACK Infrastructure

Compare in a collection
Aligned Ashburn IAD01–IAD02 Data Center Campus

Partially operational · Ashburn, Virginia, United States

Same locality: Ashburn

Compare in a collection
DataBank IAD1 Ashburn Data Center

Operating · Ashburn, Virginia, United States

Same locality: Ashburn

Compare in a collection
Digital Realty ACC4 Ashburn Data Center

Operating · Ashburn, Virginia, United States

Same locality: Ashburn

Compare in a collection