STACK Loudoun County Arcola Data Center Campus

Ashburn, Virginia, United StatesPreconstruction
Capacity
200 MW
Planned / design
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 29, 2026
Most recent public record update

About STACK Loudoun County Arcola Data Center Campus

STACK Loudoun County Arcola Data Center Campus, also known as STACK Loudoun County 144MW Campus, is a data center project in Ashburn, VA, US developed and operated by STACK Infrastructure. Greater Ashburn campus planned as two 72 MW, two-story data center buildings totaling 144 MW. Closed-loop water cooling and flexible deployment models designed for AI, machine-learning and cloud workloads. STACK now markets the same Arcola/Loudoun campus at 200 MW across two two-story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load144 MWDesign · STACK Loudoun County Arcola Data Center Campus
Future Potential200 MWDesign · STACK Loudoun County Arcola Data Center Campus

Development

1 phases · 2 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

STACK now markets the same Arcola/Loudoun campus at 200 MW across two two-story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.

Feb 11, 2025
STACK announced 144 MW Loudoun campus
Completed
Aug 29, 2026
Current project page reports 200 MW Arcola plan
Completed

Infrastructure

Electric GridPlanned Or Represented

Closed-loop water cooling and flexible deployment models designed for AI, machine-learning and cloud workloads.

FiberPlanned Or Represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
STACK Loudoun County 144MW Campus | Ashburn | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
144 MW
Design
Capacity Basis
STACK Infrastructure publishes 144 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK Loudoun County 144MW Campus | Ashburn | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
200 MW
Design
Capacity Basis
STACK now markets the same Arcola/Loudoun campus at 200 MW across two two story facilities, superseding the 144 MW announcement. It remains future capacity, not operating IT.
Actual
Site Area
122 acres
Design
Building Count
2 facilities
Design
Building Form
Two story
Design