STACK GEN02 Geneva Data Center Campus
Partially operational · Geneva, Switzerland
STACK GEN03 is a separate proposed wholesale campus near Geneva, not part of the Vaultica GEN02 operating record. The current 12 MW boundary is future potential: Knight Frank reported the committed Geneva pipeline as fully pre-leased but said GEN03 had not broken ground by year-end 2025. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Projects sharing a market, utility, or organization.
Partially operational · Geneva, Switzerland
STACK GEN03 is a separate proposed wholesale campus near Geneva, not part of the Vaultica GEN02 operating record. The current 12 MW boundary is future potential: Knight Frank reported the committed Geneva pipeline as fully pre-leased but said GEN03 had not broken ground by year-end 2025. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
12 MW
12 MW is the published future facility or full-build design boundary; it is not operating IT load.
Swiss facility designed for renewable power, carrier connectivity and resilient operations.
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.