STACK GEN03 Geneva Data Center Campus

Geneva, SwitzerlandPreconstruction
Capacity
12 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK GEN03 Geneva Data Center Campus

STACK GEN03 is a separate proposed wholesale campus near Geneva, not part of the Vaultica GEN02 operating record. The current 12 MW boundary is future potential: Knight Frank reported the committed Geneva pipeline as fully pre-leased but said GEN03 had not broken ground by year-end 2025. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load12 MWDesign · STACK GEN03 Geneva Data Center Campus
Future Potential12 MWDesign · STACK GEN03 Geneva Data Center Campus

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

STACK GEN03 is a separate proposed wholesale campus near Geneva, not part of the Vaultica GEN02 operating record. The current 12 MW boundary is future potential: Knight Frank reported the committed Geneva pipeline as fully pre-leased but said GEN03 had not broken ground by year-end 2025. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridPlanned Or Represented

12 MW

12 MW is the published future facility or full-build design boundary; it is not operating IT load.

FiberPlanned Or Represented

Swiss facility designed for renewable power, carrier connectivity and resilient operations.

Cooling SystemPlanned Or Represented

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

16 facts
Location Context
STACK GEN03 | Geneva | Geneva | CH
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
12 MW
Design
Capacity Basis
STACK Infrastructure publishes 12 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK GEN03 | Geneva | Geneva | CH
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW is the published future facility or full build design boundary;
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Geneva, Geneva, CH
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
12 MW is the published future facility or full build design boundary;
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Construction Started By 2025 Year End
No