GEN02 is the existing Gland facility now operated as Vaultica GEN02 after the Apollo-backed carve-out of STACK’s European colocation business. Vaultica reports 30 MW, 15,400 square metres of white space, renewable electricity, four diverse fibre entries and two meet-me rooms. The Cartis identity is preserved with Vaultica added as the current operator and STACK retained as former operator/developer. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
GEN02 is the existing Gland facility now operated as Vaultica GEN02 after the Apollo-backed carve-out of STACK’s European colocation business. Vaultica reports 30 MW, 15,400 square metres of white space, renewable electricity, four diverse fibre entries and two meet-me rooms. The Cartis identity is preserved with Vaultica added as the current operator and STACK retained as former operator/developer. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Milestones (3)
Apr 29, 2025 · Recorded actual event
Completed · Status changed
Source not linkedDec 2025 · Recorded actual event
Completed · Status changed
Source not linkedAug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer · Operator
Sources by role
Developer (1)
- STACK Infrastructure STACK GEN02 profile · Aug 28, 2026 · Primary
Operator (1)
- Apollo acquisition of STACK European colocation business · Apr 29, 2025 · Primary
Site & development
Technical specifications
Additional project facts
Capacity basis
ActualSTACK Infrastructure publishes 30 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualVaultica currently reports 30 MW for GEN02 at Gland. This is the current operator IT-load boundary, not measured customer draw.
SourceCapacity basis
ActualVaultica currently reports 30 MW for GEN02 at Gland. This is the current operator IT-load boundary, not measured customer draw.
SourceInfrastructure & permits
Technical details (3)
Operational
30 MW
Vaultica currently reports 30 MW for GEN02 at Gland. This is the current operator IT-load boundary, not measured customer draw.
Operational
Carrier-neutral multi-tenant campus served by renewable power with rack-ready deployment capability.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Preconstruction · Geneva, Switzerland
Same locality: Geneva · Shared participant: STACK Infrastructure
Compare in a collection