All records
Data center siteSite record
Scaleway DC5 PAR2 Data Center
Saint-Ouen-l-Aumone, Ile-de-France, FranceOperating / Stabilized
Capacity
20 MW
Planned critical IT
Lead participant
OpCore
Operator
Last updated
Sep 1, 2026
Most recent public record update
About Scaleway DC5 PAR2 Data Center
Scaleway DC5, also designated PAR2, is an operating hyperscale data center northwest of Paris. The 16,000-square-meter facility contains 12 private suites and provides more than 20 MW of IT design capacity. Direct free cooling with adiabatic support produced a reported 2024 PUE of 1.16, and the site’s electricity is covered by renewable guarantees of origin.
Capacity
Planned critical ITOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
It Load20 MWActual · Scaleway DC5 PAR2 Data Center
Development
1 phases · 1 milestonesDC5 PAR2Operational
Twelve-suite hyperscale facility in service.
Oct 21, 2020
Scaleway introduced DC5 PAR2
CompletedInfrastructure
Cooling SystemOperational
Direct free cooling with adiabatic support.
Renewable Energy SupplyOperational
100 percent
Electricity covered by renewable guarantees of origin.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
1
No map point available
Power & interconnection: 1Cooling & water: 1
Facts & sources
Published claims and their source links.
Reported CapacityMore than 20 MW operating IT design capacity MWActual
More than 20 MW operating IT design capacity MW
Building Area16,000 square metersActual
16,000 square meters
Suite Count12 suitesActual
12 suites
Pue1.16 ratioActual
1.16 ratio