Cartis diligence evidence schedule
Scala Tamboré Campus
PRJ-1304 · Site · Barueri, São Paulo, Brazil
Record last updated Oct 31, 2026
Scope and capacity
Scala's Tamboré campus in Barueri, São Paulo, combines operating buildings with continuing phased development toward 450 MW of planned IT capacity. This is not the current operating load. A 560 MW substation figure and broader total-power marketing describe different electrical scopes. The operator records the inauguration of SGRUTB06 in April 2025. A separate August 2024 green-debt issue supported completion of the 36 MW SGRUTB09 building, not the entire campus: the final distributed amount was approximately BRL1.373 billion, announced as about US$250 million. Financing proceeds are not total campus capex, and named issue coordinators are not automatically bondholders. Current full-campus occupied IT capacity remains unverified.
Headline: 450 MW Planned critical IT
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (3)
Target IT capacity MW · 450 MW
Planned / design or future potential · Scala Tamboré Campus (Project)
Claim 160840 · Recorded claim type: Forecast · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Scala Data Centers and BNDES complete the second phase of the bank’s largest financing in the sector, totaling BRL 380 million to date
Scala Data Centers · Document date: Nov 28, 2025 · Primary
Source reference: SRC-8154 · Company announcement · Recorded authority: Party primary
Source URL
https://scaladatacenters.com/scala_na_midia/scala-data-centers-and-bndes-complete-the-second-phase-of-the-banks-largest-financing-in-the-sector-totaling-brl-380-million-to-date/
https://scaladatacenters.com/scala_na_midia/scala-data-centers-and-bndes-complete-the-second-phase-of-the-banks-largest-financing-in-the-sector-totaling-brl-380-million-to-date/
- Scala Data Centers announces the groundbreaking of a 560 MW Power Substation in São Paulo: A Game-Changer for Brazil’s Digital Infrastructure Landscape
Scala Data Centers · Document date: May 6, 2024 · Corroborating
Source reference: SRC-8155 · Company announcement · Recorded authority: Party primary
Source URL
https://scaladatacenters.com/en/scala-data-centers-announces-the-groundbreaking-of-a-560-mw-power-substation-in-sao-paulo-a-game-changer-for-brazils-digital-infrastructure-landscape/
https://scaladatacenters.com/en/scala-data-centers-announces-the-groundbreaking-of-a-560-mw-power-substation-in-sao-paulo-a-game-changer-for-brazils-digital-infrastructure-landscape/
Site location · Tamboré district, Barueri. Certified component addresses include SGRUTB01 Avenida Ceci 1900, SGRUTB04 Rua João Ferreira de Camargo 1217, and SGRUTB12 Avenida Ceci 1649, Block 03. These establish campus components, not a surveyed perimeter.
Reported rounded · Scala Tamboré Campus (Project)
Claim 160841 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- CERTIFICATE — SCALA DATA CENTERS S.A. — ISO/IEC 27001:2022 — IND.25.6501/IS/U
Bureau Veritas Certification Holding SAS - UK Branch; hosted by Scala Data Centers · Document date: Jan 15, 2026 · Primary
Source reference: SRC-8156 · Company announcement · Recorded authority: Party primary
Source URL
https://scaladatacenters.com/wp-content/uploads/2026/02/Certificate-BR042843-Item-1-96NDP6G-2_Flavia-Cassia-Meneze-1.pdf
https://scaladatacenters.com/wp-content/uploads/2026/02/Certificate-BR042843-Item-1-96NDP6G-2_Flavia-Cassia-Meneze-1.pdf
Land and site control context · Several verified campus building addresses; exact parcel owners and complete acreage not established in this pass.
Reported rounded · Scala Tamboré Campus (Project)
Claim 160842 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated
- CERTIFICATE — SCALA DATA CENTERS S.A. — ISO/IEC 27001:2022 — IND.25.6501/IS/U
Bureau Veritas Certification Holding SAS - UK Branch; hosted by Scala Data Centers · Document date: Jan 15, 2026 · Primary
Source reference: SRC-8156 · Company announcement · Recorded authority: Party primary
Source URL
https://scaladatacenters.com/wp-content/uploads/2026/02/Certificate-BR042843-Item-1-96NDP6G-2_Flavia-Cassia-Meneze-1.pdf
https://scaladatacenters.com/wp-content/uploads/2026/02/Certificate-BR042843-Item-1-96NDP6G-2_Flavia-Cassia-Meneze-1.pdf
Counterparties and capital
Scala Data Centers · Developer, Operator · CMP-0464
R$1,372,775,000 · Aug 19, 2024
SGRUTB09 36 MW IT building only: final distributed BRL1,372,775,000, announced approximately US$250m equivalent; six-year BRL debt swapped to USD. Fourth secured non-convertible debenture issue in two series. Closing announced August 19, 2024; issue date August 10. Bradesco BBI lead coordinator; UBS BB, Banco Santander Brasil and Itau BBA co-coordinators; Oliveira Trust fiduciary agent; Banco Bradesco registrar/settlement agent. These roles do not identify ultimate bondholders. Only the independently screened lead coordinator is structurally linked. BRL1.5bn trustee-report volume differs from final distributed amount and is not substituted. Not total campus capex.
Banco Bradesco BBI S.A. (Arranger)
Financing record 359; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.