Scala Tamboré Campus

Barueri, São Paulo, BrazilPartially operational
Evidence
Planned critical IT
450 MW
Updated
Oct 31, 2026

Scala's Tamboré campus in Barueri, São Paulo, combines operating buildings with continuing phased development toward 450 MW of planned IT capacity. This is not the current operating load. A 560 MW substation figure and broader total-power marketing describe different electrical scopes. The operator records the inauguration of SGRUTB06 in April 2025. A separate August 2024 green-debt issue supported completion of the 36 MW SGRUTB09 building, not the entire campus: the final distributed amount was approximately BRL1.373 billion, announced as about US$250 million. Financing proceeds are not total campus capex, and named issue coordinators are not automatically bondholders. Current full-campus occupied IT capacity remains unverified.

Capacity

Target IT capacity MW

Planned / design or future potential

450 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Milestones (4)
SSUBTB03 substation groundbreaking announced.

May 6, 2024 · Recorded actual event

Completed · Announced

Sources (1)
Green debenture issuance for SGRUTB09 completion.

Aug 2024 · Recorded actual event

Completed · Announced

Sources (1)
SGRUTB06 inaugurated according to operator chronology.

Apr 2025 · Recorded actual event

Completed · Announced

Sources (1)
Operator update reiterates 450 MW IT campus scale. BNDES aggregate corporate financing should not be booked entirely to Tamboré.

Nov 28, 2025 · Recorded actual event

Completed · Announced

Sources (1)

Participants

Capital & incentives

Financing records

Debt financing

R$1,372,775,000

Aug 19, 2024

SGRUTB09 36 MW IT building only: final distributed BRL1,372,775,000, announced approximately US$250m equivalent; six-year BRL debt swapped to USD. Fourth secured non-convertible debenture issue in two series. Closing announced August 19, 2024; issue date August 10. Bradesco BBI lead coordinator; UBS BB, Banco Santander Brasil and Itau BBA co-coordinators; Oliveira Trust fiduciary agent; Banco Bradesco registrar/settlement agent. These roles do not identify ultimate bondholders. Only the independently screened lead coordinator is structurally linked. BRL1.5bn trustee-report volume differs from final distributed amount and is not substituted. Not total campus capex.

Parties & sources

Banco Bradesco BBI S.A. (Arranger)

Site & development

Site location

Reported rounded

Tamboré district, Barueri. Certified component addresses include SGRUTB01 Avenida Ceci 1900, SGRUTB04 Rua João Ferreira de Camargo 1217, and SGRUTB12 Avenida Ceci 1649, Block 03. These establish campus components, not a surveyed perimeter.

Source

Land and site control context

Reported rounded

Several verified campus building addresses; exact parcel owners and complete acreage not established in this pass.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Reported context

SSUBTB03 groundbreaking announced May 2024, design 560 MW and investment over US$80M. Energization date and firm utility allocation not independently recovered.

Cooling system

Reported context

SGRUTB09 design targets annual PUE below 1.3 and zero cooling WUE. Do not apply one building’s design target as measured campus-wide performance.

Fiber

Reported context

Operator describes carrier neutrality, diverse dark-fiber routes and underground campus infrastructure. No up-to-date campus carrier count established.

Utility service

Planned or represented

560 MW

SSUBTB03 substation design rating; not IT load and energization unverified.

Public-source research. Plans may change. See Evidence for sources and qualifications.