Rowan Project Temple
About Rowan Project Temple
Rowan is building a 300 MW hyperscale campus on roughly 700 acres in south Temple for an undisclosed global technology customer. Construction is underway, power is secured through Oncor, and operations are expected in 2027.
Related projects
Projects sharing a market, utility, or organization.
Capacity
No additional capacity claims are published.
Development
2 phases · 4 milestones300 MW full build-out; customer identity undisclosed.
Forecast, not achieved operations.
Infrastructure
300 MW
Full-build campus design scale.
300 MW
Power secured through Oncor; capacity label follows campus scale, not observed load.
Existing Moriah utility and Rowan power infrastructure avoids new transmission/substation construction.
2 million US gallons
Reported agreement range is 1–2 million gallons; maximum retained.
4,000 US gallons/day
Closed-loop cooling daily maximum after initial fill.