Cartis diligence evidence schedule
Pure DC AUH01 Yas Island Campus
PRJ-0472 · Site · Yas Island / Abu Dhabi, AZ, United Arab Emirates
Captured 2026-09-06T04:13:59.652Z · Record last updated 2026-08-25
SHA-256: f82d625362bca86792fdfc2b94a2c69acd75324fad9fbf85c4c8d3c21f2a3280
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Campus boundary for two buildings and shared 48 MW design; the 7 MW approval is an increment within 48 MW, not additional.
Headline: 48 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Current Full Campus Design Capacity · 48 MW
Planned / design or future potential · Pure DC AUH01 Yas Island Campus (project)
Claim 44977 · Review: Approved · Claim date: Not published · Supersedes 44978
Headline treatment: Selected headline
- Pure DC commits to Middle East focus backed by in-region solar renewables
Pure Data Centres Group · Document date: 2026-04-27 · Primary
https://puredc.com/2026/04/27/pure-dc-commits-to-middle-east-focus-backed-by-in-region-solar-renewables - Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Approved Design Optimization Increment · 7 MW
Planned / design or future potential · Pure DC AUH01 Yas Island Campus (project)
Claim 44980 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Pure DC commits to Middle East focus backed by in-region solar renewables
Pure Data Centres Group · Document date: 2026-04-27 · Primary
https://puredc.com/2026/04/27/pure-dc-commits-to-middle-east-focus-backed-by-in-region-solar-renewables
Site Area · 16.19 acres
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44981 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Physical Building Count · 2
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44982 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Total Building Area · 40,150 square meters
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44983 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Average Annualized Pue · 1.38 PUE
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44984 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Water System · Closed loop
actual · Pure DC AUH01 Yas Island Campus (project)
Claim 44985 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Cooling Design · Hybrid air and liquid cooling
actual · Pure DC AUH01 Yas Island Campus (project)
Claim 44986 · Review: Approved · Claim date: Not published
- Abu Dhabi Yas Island (AUH01)
Pure Data Centres Group · Document date: Not published · Primary
https://puredc.com/abu-dhabi
Final Utility Approval Received · True
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44997 · Review: Approved · Claim date: 2026-04-27T00:00:00+00:00
- Pure DC commits to Middle East focus backed by in-region solar renewables
Pure Data Centres Group · Document date: 2026-04-27 · Primary
https://puredc.com/2026/04/27/pure-dc-commits-to-middle-east-focus-backed-by-in-region-solar-renewables
Electricity Matched With Irecs · 100 percent of 2025 electricity
Source report · Pure DC AUH01 Yas Island Campus (project)
Claim 44998 · Review: Approved · Claim date: Not published
- Pure DC commits to Middle East focus backed by in-region solar renewables
Pure Data Centres Group · Document date: 2026-04-27 · Primary
https://puredc.com/2026/04/27/pure-dc-commits-to-middle-east-focus-backed-by-in-region-solar-renewables
Security Provider · Securitas
actual · Pure DC AUH01 Yas Island Campus (project)
Claim 45002 · Review: Approved · Claim date: Not published
- Pure DC chooses Securitas as security partner for Abu Dhabi data centre
Pure Data Centres Group · Document date: 2025-05-28 · Primary
https://puredc.com/2025/05/28/pure-dc-chooses-securitas-as-security-partner-for-abu-dhabi-data-centre
Counterparties and capital
Oaktree Capital Management · Owner · CMP-0742
Pure Data Centres Group · Operator · CMP-0741
$550,000,000 · 2026-05-27
Pure DC corporate-level facility; may support growth across the platform but no AUH01 allocation is disclosed.
ABN AMRO (Named Financing Institution) · Allianz Global Investors (Named Financing Institution) · Pure Data Centres Group (Borrower) · SMBC (Named Financing Institution)
Financing record 134; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.