Prime Los Angeles LAX01 Data Center Campus
Operating / Stabilized · Vernon, California, United States
Prime SMF02 is the second data center on Prime Data Centers' Sacramento campus and entered construction with a May 7, 2026 groundbreaking. The facility is designed for 150,000 square feet and 18 MW of critical IT capacity. Prime says SMF02 will use closed-loop chilled-water cooling, while the broader Sacramento campus is served by SMUD with an on-site substation. Current campus materials report 10 carriers in proximity; that figure describes campus connectivity rather than an SMF02-specific on-net carrier count. The project is expected to support roughly 250 construction jobs and about 30 permanent operating jobs.
Projects sharing a market, utility, or organization.
Operating / Stabilized · Vernon, California, United States
Partially operational · Santa Clara Region, California, United States
No additional capacity claims are published.
150,000 ft² second Sacramento-campus facility with 18 MW critical IT.
1 building
The Sacramento campus is served by SMUD.
Closed-loop chilled-water cooling designed to recirculate water and support high-density compute.
10 carriers
The Sacramento campus page reports 10 carriers in proximity; this is campus connectivity context rather than an SMF02-specific on-net count.
No map point available
Claim review and source dates are shown separately. A record update date is not a claim review date.