Prime Phoenix Campus PHX01

PRJ-0602 · Site · Avondale, Arizona, United States

Captured 2026-09-06T04:12:50.094Z · Record last updated 2026-08-27

SHA-256: 67c7ee8b7c8d705701275afdea91c141339b230a0a239a93bfe248529976bacc

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Prime Data Centers broke ground in May 2026 on the first three buildings of PHX01 in Avondale, Arizona. The five-building, 66.5-acre campus is designed for 240 MW of critical IT load and represents an announced investment of roughly $3 billion. SRP utility service and an on-site substation are planned.

Headline: 240 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Location Context · Prime PHX01 campus | Avondale | Arizona | United States

actual · Prime Phoenix Campus PHX01 (project)

Claim 54717 · Review: Approved · Claim date: Not published

  1. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Lifecycle Status · Construction

actual · Prime Phoenix Campus PHX01 (project)

Claim 54718 · Review: Approved · Claim date: Not published

  1. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Reported Capacity · 240 MW

design · Prime Phoenix Campus PHX01 (project)

Claim 54719 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Capacity Basis · Five building campus critical IT design

actual · Prime Phoenix Campus PHX01 (project)

Claim 54720 · Review: Approved · Claim date: Not published

  1. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Project Identity · Prime Phoenix Campus PHX01

actual · Prime Phoenix Campus PHX01 (project)

Claim 119581 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Lifecycle Status · Construction program

actual · Prime Phoenix Campus PHX01 (project)

Claim 119582 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Location · Avondale, Maricopa County, AZ, US

actual · Prime Phoenix Campus PHX01 (project)

Claim 119583 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Participant Roles · Prime Data Centers

actual · Prime Phoenix Campus PHX01 (project)

Claim 119584 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Capacity · 240 MW

design · Prime Phoenix Campus PHX01 (project)

Claim 119585 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Capacity Basis · 240 MW planned critical IT design capacity

Planned / design or future potential · Prime Phoenix Campus PHX01 (project)

Claim 119586 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Development Scale · Prime Data Centers broke ground in May 2026 on the first three buildings of PHX01 in Avondale, Arizona. The five building, 66.5-acre campus is designed for 240 MW of critical IT load and represents an announced investment of roughly $3 billion

actual · Prime Phoenix Campus PHX01 (project)

Claim 119587 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Infrastructure · SRP utility service and an on site substation are planned.

Planned / design or future potential · Prime Phoenix Campus PHX01 (project)

Claim 119588 · Review: Approved · Claim date: Not published

  1. $3 Billion Avondale Data Center Breaks Ground

    Greater Phoenix Economic Council · Document date: 2026-05-21 · Corroborating

    https://metrophoenix.com/2026/05/3-billion-avondale-data-center-breaks-ground/
  2. Prime breaks ground on three buildings at 240 MW Phoenix campus

    Prime Data Centers · Document date: 2026-05-21 · Primary

    https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/

Counterparties and capital

Prime Data Centers · Developer · CMP-0167

Investment Commitment

$3,000,000,000 · 2026-05-21

Announced PHX01 investment.

Prime Data Centers (Sponsor)

Financing record 243; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.