Cartis diligence evidence schedule
OADC Lagos LOS1
PRJ-0471 · Site · Lekki / Lagos, LA, Nigeria
Record last updated Oct 28, 2026
Scope and capacity
OADC Lagos LOS1 is one physical facility with an operating first phase and a planned expansion. The published 24 MW figure describes planned site load rather than operating IT capacity.
Headline: 24 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (13)
Current site load design · 24 MW
Planned / design or future potential · OADC Lagos LOS1 (Project)
Claim 44956 · Recorded claim type: Design · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Technical space · 7,200 square meters
Source report · OADC Lagos LOS1 (Project)
Claim 44957 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- WIOCC's OADC launches data centers in Lagos and Johannesburg
DatacenterDynamics · Document date: Dec 7, 2022 · Primary
Source reference: SRC-2498 · News report
Source URL
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Cooling redundancy · N+1
Actual · OADC Lagos LOS1 (Project)
Claim 44958 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Carrier neutral · True
Source report · OADC Lagos LOS1 (Project)
Claim 44959 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- WIOCC's OADC launches data centers in Lagos and Johannesburg
DatacenterDynamics · Document date: Dec 7, 2022 · Primary
Source reference: SRC-2498 · News report
Source URL
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Equiano landing station · True
Source report · OADC Lagos LOS1 (Project)
Claim 44960 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- WIOCC's OADC launches data centers in Lagos and Johannesburg
DatacenterDynamics · Document date: Dec 7, 2022 · Primary
Source reference: SRC-2498 · News report
Source URL
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Tier design · Tier III designed
Actual · OADC Lagos LOS1 (Project)
Claim 44961 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- WIOCC's OADC launches data centers in Lagos and Johannesburg
DatacenterDynamics · Document date: Dec 7, 2022 · Primary
Source reference: SRC-2498 · News report
Source URL
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
- Nigeria Data Centres — OADC Lagos
Open Access Data Centres · Document date: Not stated · Primary
Source reference: SRC-2492 · Recorded authority: Party primary
Source URL
https://www.openaccessdc.net/lagos
https://www.openaccessdc.net/lagos
Operational since · 2022-12
Actual · OADC Lagos LOS1 (Project)
Claim 44962 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- WIOCC's OADC launches data centers in Lagos and Johannesburg
DatacenterDynamics · Document date: Dec 7, 2022 · Primary
Source reference: SRC-2498 · News report
Source URL
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
https://www.datacenterdynamics.com/en/news/wioccs-oadc-launches-data-centers-in-lagos-nigeria-and-joburg-south-africa/
Expansion stage count · 2 stages
Source report · OADC Lagos LOS1 (Project)
Claim 44965 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- Open Access Data Centres plans USD240m data center in Lagos
DatacenterDynamics · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2494 · News report
Source URL
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
- OADC to invest USD240m to expand Lagos data centre to 24MW by 2027
Developing Telecoms · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2495 · News report
Source URL
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
Expansion stage capacity · 12 MW per stage
Planned / design or future potential · OADC Lagos LOS1 (Project)
Claim 44966 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Open Access Data Centres plans USD240m data center in Lagos
DatacenterDynamics · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2494 · News report
Source URL
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
- OADC to invest USD240m to expand Lagos data centre to 24MW by 2027
Developing Telecoms · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2495 · News report
Source URL
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
Forecast full expansion year · 2,027
Actual · OADC Lagos LOS1 (Project)
Claim 44967 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- OADC to invest USD240m to expand Lagos data centre to 24MW by 2027
Developing Telecoms · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2495 · News report
Source URL
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
Announced maximum investment · $240 million
Source report · OADC Lagos LOS1 (Project)
Claim 44969 · Recorded claim type: Not stated · Review: Approved · Claim date: Mar 25, 2025
- Open Access Data Centres plans USD240m data center in Lagos
DatacenterDynamics · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2494 · News report
Source URL
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
- OADC to invest USD240m to expand Lagos data centre to 24MW by 2027
Developing Telecoms · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2495 · News report
Source URL
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
https://developingtelecoms.com/telecom-technology/data-centres-networks/18230-oadc-to-invest-us-240m-to-expand-lagos-data-centre-to-24mw-by-2027.html
Expansion funding plan · Debt and equity
Actual · OADC Lagos LOS1 (Project)
Claim 44970 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Open Access Data Centres plans USD240m data center in Lagos
DatacenterDynamics · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2494 · News report
Source URL
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
Expansion power options · Grid plus gas and renewable generation under evaluation
Actual · OADC Lagos LOS1 (Project)
Claim 44971 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- Open Access Data Centres plans USD240m data center in Lagos
DatacenterDynamics · Document date: Mar 25, 2025 · Primary
Source reference: SRC-2494 · News report
Source URL
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
https://www.datacenterdynamics.com/en/news/open-access-data-centres-plans-240m-data-center-in-lagos-nigeria-report/
Counterparties and capital
Open Access Data Centres · Operator · CMP-1156
WIOCC Group · Owner · CMP-1157
$10,000,000 · Jun 27, 2024
IFC financing to WIOCC for regional data-center and fiber expansion; no LOS1 allocation.
International Finance Corporation (Lender) · WIOCC Group (Borrower)
Sources (1)
- IFC, Proparco and RMB Partner with WIOCC Group · Jun 27, 2024
Financing record 130; claim-specific source links appear in the exhibit sources where published.
ZAR 200,000,000 · Jun 27, 2024
IFC financing to WIOCC for regional data-center and fiber expansion; no LOS1 allocation.
International Finance Corporation (Lender) · WIOCC Group (Borrower)
Sources (1)
- IFC, Proparco and RMB Partner with WIOCC Group · Jun 27, 2024
Financing record 131; claim-specific source links appear in the exhibit sources where published.
$20,000,000 · Jun 27, 2024
Proparco financing to WIOCC for regional expansion; no LOS1 allocation.
Proparco (Lender) · WIOCC Group (Borrower)
Sources (2)
- IFC, Proparco and RMB Partner with WIOCC Group · Jun 27, 2024
- WIOCC poursuit l'aménagement numérique du continent africain · Jun 27, 2024
Financing record 132; claim-specific source links appear in the exhibit sources where published.
$10,000,000 · Jun 27, 2024
The announcement described a planned RMB loan; closing status and LOS1 allocation have not been publicly disclosed.
Rand Merchant Bank (Planned lender) · WIOCC Group (Planned borrower)
Sources (1)
- IFC, Proparco and RMB Partner with WIOCC Group · Jun 27, 2024
Financing record 133; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.