OADC Lagos LOS1
Lekki / Lagos, LA, NigeriaPartially operational
Capacity
24 MW
Planned / design
Lead participant
Open Access Data Centres
Operator
Last updated
Aug 25, 2026
Most recent public record update
About OADC Lagos LOS1
OADC Lagos LOS1 is one physical facility with an operating first phase and a planned expansion. The published 24 MW figure describes planned site load rather than operating IT capacity.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design24 MWDesign · OADC Lagos LOS1
Design12 MWFact · OADC Lagos LOS1
Development
3 phases · 4 milestonesLOS1 first operating phaseOperational
Opening sources described up to 20 MW design on the four-hectare site.
1 building
LOS1 expansion stage 1Announced Or Preconstruction
March 2025 reporting targeted completion within 18 months.
LOS1 expansion stage 2Announced Or Preconstruction
Part of the plan to reach 24 MW by 2027; schedule detail remains undisclosed.
Dec 7, 2022
LOS1 announced operational in Lekki
CompletedMar 25, 2025
Two-stage 24 MW LOS1 expansion reported
CompletedJul 1, 2026
Derived 18-month first-stage target
ForecastJan 1, 2027
Reported target for 24 MW expansion
ForecastInfrastructure
FiberOperational
144 Tbps design capacity
Equiano lands at LOS1; cable design capacity reported at launch, not facility bandwidth sold.
Electric GridPartially Operational
24 MW site load design
Current operator site load; live IT and stage energization undisclosed.
Cooling SystemOperational
N+1 cooling redundancy.
Project map
0 of 1 project point mappedInfrastructure facts
3
Mapped records
1
Capacity figures
2
No map point available
Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1
Facts & sources
Published claims and their source links.
Current Site Load Design24 MWDesign
24 MW
Technical Space7,200 square metersFact
7,200 square meters
Cooling RedundancyN+1Actual
N+1
Carrier NeutralTrueFact
True
Equiano Landing StationTrueFact
True
Tier DesignTier III designedActual
Tier III designed
Operational Since2022-12Actual
2022-12
Expansion Stage Count2 stagesFact
2 stages
Expansion Stage Capacity12 MW per stageFact
12 MW per stage
Forecast Full Expansion Year2,027Actual
2,027
Announced Maximum Investment$240 millionFact
$240 million
Expansion Funding PlanDebt and equityActual
Debt and equity
Expansion Power OptionsGrid plus gas and renewable generation under evaluationActual
Grid plus gas and renewable generation under evaluation