EdgeCore Mesa Data Center Campus
Under construction · Mesa, Arizona, United States
NTT's Elliot Road campus in Mesa currently lists PH1 and PH4 as Phoenix facilities, each with 36 MW of critical IT load. The 102-acre campus was planned for seven buildings and 240 MW when fully operational.
Projects sharing a market, utility, or organization.
Under construction · Mesa, Arizona, United States
Six 6 MW vaults; exact ready-for-service date remains unresolved.
1 building
Current NTT product page; opening date remains unresolved.
1 building
Campus envelope, not current delivered IT load.
7 buildings
36 MW
PH1 facility-specific current product metric.
36 MW
PH4 facility-specific current product metric.
240 MW
Seven-building campus capacity when fully operational; not current delivered total.
Current PH1/PH4 pages describe on-site substation and diverse power distribution.
Closed-loop cooling; not a zero-water claim.