NTT DATA Zurich 1 Data Center Campus

Rümlang, ZH, SwitzerlandPartially operational
Capacity
20 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update

About NTT DATA Zurich 1 Data Center Campus

NTT DATA Zurich 1 Data Center Campus, also known as NTT Zurich 1, is a data center project in Rümlang, ZH, CH associated with NTT DATA. 10,500+ square metres of server space and 20 MW maximum critical IT load. Carrier-neutral Zurich campus with two independent substation feeds and Swiss IX connectivity.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load20 MWDesign · NTT DATA Zurich 1 Data Center Campus
Design20 MWDesign · NTT DATA Zurich 1 Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

20 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for NTT Zurich 1
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Carrier-neutral Zurich campus with two independent substation feeds and Swiss IX connectivity.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
NTT Zurich 1 | Rümlang | ZH | CH
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
NTT DATA publishes 20 MW of critical IT capacity for this record boundary.
Actual
Location Context
NTT Zurich 1 | Rümlang | ZH | CH
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
20 MW
Design
Capacity Basis
20 MW facility or campus design capacity.
Actual
Project Identity
NTT Zurich 1
Actual
Location Context
Rümlang, ZH, CH
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
10,500+ Square metres of server space and 20 MW maximum critical IT load.
Actual
Capacity Basis
20 MW facility or campus design capacity.
Actual