NTT DATA Navi Mumbai 1 Data Center Campus

Navi Mumbai, Maharashtra, IndiaPartially operational
Evidence
Planned critical IT
100.4 MW
Updated
Oct 28, 2026

NTT DATA Navi Mumbai 1 Data Center Campus, also known as NTT Navi Mumbai 1 Campus, is a data center project in Navi Mumbai, MH, IN associated with NTT DATA. NAV1A at 30 MW, NAV1B at 30.4 MW, plus NAV1C and NAV1D planned for 40 MW combined; 100.4 MW full-build IT load. Multi-building Mumbai-region hyperscale campus with carrier-neutral connectivity and liquid-cooling options. 30 MW is NAV1A current critical IT design. The legacy 100.4 MW total combines NAV1A with the 30.4 MW NAV1B and 40 MW NAV1C/NAV1D later-phase plan.

Capacity

Reported capacity

Design

100.4 MW

Source

Reported capacity

Planned / design or future potential

30 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

30 MW is NAV1A current critical IT design. The legacy 100.4 MW total combines NAV1A with the 30.4 MW NAV1B and 40 MW NAV1C/NAV1D later-phase plan.

Participants

NTT DATA

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NTT Navi Mumbai 1 Campus | Navi Mumbai | MH | IN

Source

Location context

Actual

NTT Navi Mumbai 1 Campus | Navi Mumbai | MH | IN

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NTT DATA publishes 100.4 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

30 MW is NAV1A current critical IT design. The legacy 100.4 MW total combines NAV1A with the 30.4 MW NAV1B and 40 MW NAV1C/NAV1D later phase plan.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Multi-building Mumbai-region hyperscale campus with carrier-neutral connectivity and liquid-cooling options.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Planned or represented

45 MW facility load

NAV1A facility-load rating is not IT capacity; later buildings remain separate phases.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
AirTrunk BOM2 Campus

Proposed · Navi Mumbai, Maharashtra, India

Same locality: Navi Mumbai

Compare in a collection
Colt Mumbai 1 and 2 Data Centres

Partially operational · Navi Mumbai, Maharashtra, India

Same locality: Navi Mumbai

Compare in a collection
Iron Mountain MUM-1

Operating · Navi Mumbai, Maharashtra, India

Same locality: Navi Mumbai

Compare in a collection
Iron Mountain MUM-2

Operating · Navi Mumbai, Maharashtra, India

Same locality: Navi Mumbai

Compare in a collection